FAKULTNÁ NEMOCNICA TREN?ÍN has floated a tender for Contract notice: Construction work. The project location is Slovakia and the tender is closing on 10 Dec 2018. The tender notice number is 493091-2018, while the TOT Ref Number is 28312888. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Slovakia

Summary : Contract notice: Construction work

Deadline : 10 Dec 2018

Other Information

Notice Type : Tender

TOT Ref.No.: 28312888

Document Ref. No. : 493091-2018

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : FAKULTNÁ NEMOCNICA TREN?ÍN
Office Name: Fakultná nemocnica Tren?ín
Address: Legionárska 28
Town: Tren?ín
Postal Code: 911 71
Contact Point: Mgr. Petra Gu?ová

Phone: +421 904281818
Fax: +421 326566840
Slovakia
Email :petra.gulova@ekoauris.sk
URL :https://www.e-lena.sk/profil/00610470

Tender Details

Object of the contract
Construction work

Description: Contract notice: Construction work

Authority Type: Body governed by public law
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: Lowest price
CPV code: 45000000, 45000000
CPV Description: The modernization of the Faculty Hospital in Trencin - The new pavilion of the Central Operational Salt, the OAIM and the urgent reception

The proposal for the modernization of the Trenč-n University Hospital in the urban planning solution is a fundamental requirement to incorporate the proposed pavilion construction into the landscape as a whole without any negative effects on the existing and planned urban relations in the Mainland: KN 746/12, 1744/17, k.For. Trenč-n

The proposal for the modernization of the Faculty Hospital Trencin in urban planning is a fundamental requirement to incorporate the proposed pavilion construction into the landscape as a whole, without any negative impact on the existing and planned urban relations in the area. intended for healthcare and the long - term aspect of the

The Faculty Hospital of Trenč-n represents the pavilion's hospital sparing without the possibility of connecting the pavilions (so-called dry feet) in the form of underground or above-ground connecting corridors.

The proposed solution in a radical way enhances the construction, hygienic, construction and technical standard by building the so- a medical-technical block in which the departments would be raided.

The detailed description of the subject of the contract is defined by the project documentation, which is the basis of the tender documents.

The public procurement may be awarded only to those who meet these conditions for the personal participation in accordance with - 32 par. 1 The applicant demonstrates the conditions for attendance at a personal postin accordance with - 32 par. 2 ZVO, or in accordance with - 152 par. The group of contractors awarded a public contract proves that the conditions for participation in the personal status under this item are met individually for each member of the Group.

Required is the submission of original or verifiable copies of all documents required in the personal status statementa. Preliminary replacement of documents proving the fulfillment of the conditions of a person's personal status, determined by the contracting authority, may also be applied for in accordance with Article 39 of the Act and the Single European Document. 6887-5000 / 2016 dated April 27, 2016 the contracting authority requires that in compliance with - 32 par. 1 pism.e) Act no. 343/2015Z.z. the public tenderer or a group of contractors has demonstrated the right to carry out construction works to the extent of the scope of the subject matter of the procurement.

The contracting authority points out that the detailed specification of the terms and conditions of the contract and its scope are set out in section A.2 of the tender documents. 1 letter. d) Public Procurement Act

Minimum required standard level:

Applicant submit-an affidavit signed by a person entitled to act on behalf of the applicant, showing the total turnover for the last three completed economic years, which are available in the dependence of the commencement or commencement of the activity. revenue and issuance reports for the required years. The contracting authority accepts also the tendersdisclosure that the document was published in the Register of Apprenticeships, which is the Ministry of Finance of the Slovak Republic (http://www.registeruz.sk/). The minimum total turnover for the last 3 completed economic years, for which it is available from the commencement or commencement of the business activity (cumulative), must be EUR 33 000 000 (thirty-three million). 1 letter. a) the lawon Public Procurement

Minimum Required Level of Standards:

Proccessor means a statement by a bank or a branch of a foreign bank, and not a unclaimed creditor's promise by which the bank or a branch of a foreign bank makes clear and certainty that in case it becomes a successful bidder and requests the bank or a foreign bank branch, a bank or a branch office of a foreign bankwill provide him with a minimum amount of EUR 2 000 000, 00 for the financial execution of the contract, the subject of which is the "Modernization of the University Hospital of Trencin" announced by the public procurement agent of the Fakultna nemocnica Trencin (or the equivalent in another currency at the ECB rate valid on the day of sending the notice to Vestnika )

From the statement of a bank or branch office of a foreign bank, they must be clear in terms of contentCertainly all the facts and data as stated and required by the contracting authority in the first sentence of this point 2 are all necessary for the fulfillment of the requisite objective of proving the ability of the applicant by operational means to secure the available funds at the time when the bank's or foreign bank's indebtedness I have to come to fulfill the Treaty, which is the resultof this public procurement

Validity of the creditor's promise: minimum during the period of commitment of the offer

Required is the submission of original or verifiable copies of all the documents required under this part-time clause

Point 3

Pursuant to - 33 par. 1 letter. a) Public Procurement Act

1.Ordinary Contractor in Sulade with Act no. 343/2015 Z.z. he publishes the tender documents-and additional documents in your profile and on the portal www.e-lena.sk.

1.1 Entrants can request the supporting documents by clicking on the link I am interested in in this order published on the portal www.e-lena.sk

2. The Public Procurement Officer will make public on www.e-lena.sk all the answers to the requests for explanation of the contract documents as well as the information concerning this order, the hours will be given to all interested parties and if there is any addition of the tender documents, the publications will be published in the profile as well as the wording of the extent of their supplementation. All costs and expenses associated with the applicant's participation in this procurement and the preparation and submission of the tender shall be made by the applicant without any financial charge to the contracting authority, irrespective of the outcome of the public procurement. In prthe supply of a group of suppliers must be a part of the tender and a special written mandate for a member of a group of suppliers with legal personality to communicate with a public procurer on behalf of a group of suppliers and a legal termination on behalf of a group of suppliers within the entire procurement process. The written authorization must be signed by all members of the group of suppliers andpresented in the offer as a scanned copy.

5. For communication purposes only the portal www.e-lena.sk will be used. Other forms of communication would be contrary to - 20 ZVO

6. The contracting authority requires the provision of security for the offer. The security is set at EUR 500, 000. Further information about the suitability and the conditions for the composition of the security is given in the Subproject documentation

7. Verejny-The contracting authority reserves the right to declare the procurement process as unsuccessful in case if the securing of project financing will not be granted non-repayable grants or sales contract does not recommend signing Managing Authority after an inspection of the procurement process. -8. Justification Retained lots: Division into lots would be a risk that the performance of the contract, the tentis overly technically difficult, the need to coordinate the contractors of the individual parts poses a risk of jeopardizing the proper execution of the order. An alert for bidders may be carried out without the necessity of physical participation in the tenderer's tender. Opening of tenders can be monitored in real time on the portal www.e-lena.sk for applicants who submit the offer. System zverthe names of the applicants and their proposals for the fulfillment of the criterion only to the applicants who submitted the offer.
Internet address (URL): https://www.e-lena.sk/profil/00610470

Documents

 Tender Notice