ÉRD MEGYEI JOGÚ VÁROS ÖNKORMÁNYZATA has floated a tender for Contract notice: Construction work. The project location is Hungary and the tender is closing on 24 Sep 2018. The tender notice number is 354699-2018, while the TOT Ref Number is 25845057. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Hungary

Summary : Contract notice: Construction work

Deadline : 24 Sep 2018

Other Information

Notice Type : Tender

TOT Ref.No.: 25845057

Document Ref. No. : 354699-2018

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : ÉRD MEGYEI JOGÚ VÁROS ÖNKORMÁNYZATA
Office Name: Érd Megyei Jogú Város Önkormányzata
Address: Alsó utca 1.
Town: Érd
Postal Code: 2030
Contact Point: Dr. Konkoly Zita

Phone: +36 23522328
Fax: +36 23522384
Hungary
Email :kozbeszerzes@erd.hu
URL :http://www.erd.hu

Tender Details

Object of the contract
Construction work

Description: Contract notice: Construction work

Authority Type: Regional or local authority
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45000000, 71320000, 45000000, 45000000, 71320000
CPV Description: Construction work.

Engineering design services.

VEKOP-5.3.3-17-2017-00002 for project implementation

Reference Number: EKR000131292018

VEKOP-5.3.3.-17-2017-00002 Kodszamu, "The Erd, Eloeljaro-Velencei roads The main site is: 2030 Erd, Velencei ut 24-38 / a, kožoett, Eloeljaro utca from Velencei to the 2nd Number VEKOP-5.3.3.-17-2017-00002. s. project for the construction of the "Erd, Prejaro - Velencei roads", which is connected to the project, is the implementation of the plan documentation, the cost of the construction work of the building and the successful completion of its commercialization. will be exportedosulasi tervek elezeszitese. On the Eloeljaro street, take into account the design plan of SPECIALTERV Epitőmernoeki Ltd. V.17 104 (2018.01).

Design curve: Velencei ut 24.-38 / a total of 244 meters long, 10 meters width the Eloeljaro street from Velencei Street to the 2.30 meters length, 6.5 meters in width.

The execution task: The Velencei ut Elthe developer of the oeljaro street intersection, the faster and safer transport of traffic. The yardstick-like, flagellous formation is the introduction of the buszoeboel, the departure of pedestrian precincts, and the epitome of a harsh rainwater drainage system. When you are in Venice, you have to turn left bends to turn left. It is in the affirmation of its strength that its sorrowlylekerekites need a beam. On the Velencei side, instead of the existing primordial patches, it is to be replaced by a new spruce. The asphalt of the Velencei utca is rebuilt, and in the smoldering places a trough can be replaced. On the Eloeljaro Street there is a new paly structure. The new buszoeboel was constructed with a terracotta cover.

The existing buszoeboel also had to place the existing pedestrian seat. The chopperis located at Velencei ut 26 / a, and they are to be built with an island with a buszoeboel. On the perimeter and on the island, it is formed with a terracotta cover.

On the side of the Velencei bridge, on both sides, the existing jardaburkolakol-k must be sanded and tanned. The yard sections are 2.5 m and 3.0 m winding and the zoeld terrain is surrounded by a gardentszeleket. The jewels are covered with asphalt claddings.

The following are some of the finest pieces:

- little bass guitars, the best of them, the television's most disparate, the posts of the columns at the beginning of Eloeljaro Street and the planned buszoeboel in the coopera- tion of the planned buszoeboel,

- designed floor coverings and troughs- The Velencei utes on the side of the sloping slopes are leveled up to the next 5 sloping coves, Uegyes utca to the left cover, Eloeljaro street to the right, the Velencei ut 33 35th is far left to the left the Velencei ut 26 / a. before the outbound pedestrian crossing point. for each side cover. furthermorethese should be added to the top of the projected buszoeboel at the points and from the groundwater drainage basin on the garden edge line. The planned gutters should be placed on the existing spinning tower by crossing the concrete cleaner.

No drainage system is currently in place at Eloeljaro Street. In which points there are 3 knobs of oesszwhich should be inserted into the spinal column via the NA-300 / KG-PVC channel located on the east side of the bridge.

The actual traffic volume should be checked for the signal flange phase. It is not possible to use a time-consuming, undervalued, and not necessarily valid, -against whom the Kbt. Article 62 (1) to (2) of the present law shall survive. Verification mode: A 321/2015. (X. 30.) Gov. (1) of Article 1 (1) of the basic Regulation, the applicant shall be required to prove in advance that he is not a party to the Kbt. Article 62 (1) and (2) of the Code of Conduct. It's the time for the timekeeperbefore the adoption of a lawsuit before the adoption of the Ordinance. Sections 8, 10, 12-16. The court must state in the statement of claim that he or she fails to comply with the Kb. (1) - (2) of Article 62. The Kbt. Article 62 (1) (k) (k) (b) of the subsection (a) of the Act on the Provider's Advance Prevention of Pre-Trial and Terrorist Financingand will be available in 2017. evi LIII. 3. - 38 (a) to (b) or (d), all prospective owners shall disclose a statement containing, or including, an easy-to-read declaration; if the economic operator does not have the real owner of the bed linen, he / she shall attach a declaration to this effect. The selection is a lot of informationplease contact us. (4) to (7) of Section 69. A 321/2015. (X.30.) Korm. Declarations made by members of the public are also accompanied by negative content. The Kbt. In the case of the application of Article 65 (7) of the Civil Code, the order of the organization of the capacity shall be attached to the order. II. and the EEKD has been tested and tested, which proves that the kaThe Pacitas Organization is not a part of the Pty. Section 62 para. (1) and (2) of the Exclusion Causes. For the time limit, see the Kbt. Subsection (4) of Section 67 (a) shall declare that he / she does not apply for the Contractor's fulfillment of the Kb. Section 62 - Taking the hypothesis of exclusionary grounds. A statement must also be issued if the date is not set out in the Termsthe name of known sub-business is known. The Kbt. Section 74 (1) (b) of the Constitution provides that the time-limiter is excluded from the procedure if the exclusion occurs in the preceding paragraph. The Order of the Order Article 7 (1) of the Constitution may also enter documents issued before the commencement of the proceedings. Tender for the Kbt. Section 65 (1) (c) and Article 32 (2) of Section 322/2015 (X.30)-(1) based on the design service related to the epithets of investment projects (the charter of the charter company), as well as the traders in the epitomous industry, in relation to the Etv. according to the name of the company involved in the construction of epithetics, in the case of non-resident operators established in the country of establishment, or in the country of resident, subject to a permit, a right or an organizational or chambers agreement. A 321/2015. (X. 30.) Paragraph 1 (1) of the Basic Law Provider must, in the EEKD's statement, confirm in advance that it complies withfor crude animal experimentation. In this case, a good statement is given by the excelent host, ie ESPD IV. Resz "α:" Must be a subtle sign "section, and no further rows will be added. Verification mode: Checks in the register are checked by the provider. In the case of the designer, -or by submitting proof of the tags of the Chamber. In the case of a non-Hungarian registered economic operator, the European Parliament and Council Directive 2014/24 / EU XI. (extract) or any other certificate or statement must be substantiated.

1. The timing is reshaping:

Kbt. Section 66 (6) a) and b) statement, noeven in litter;

Kbt. Declaration pursuant to Article 66 (2) (electronic form);

the Kbt. Article 65 (7) Declaration with the content indicated therein, if applicable, a negative statement;

If necessary, please refer to the Kbt. As in Section 35 of the Kbt. According to Article 44, the U.S. secret is cautious, and arrol solo statement by reason of Article 11 (4) of the EDF Regulation. according;

321/2015. (X.30.) Government Order no. Documents pursuant to - 13 or a non-declaration; Persons entitled to register for Alairo alairasi cimpeldanya or. uegyved, or an attorney-at-law subordinate to a Chamber's legal counsel.

2. All the qualifications and proofs to the list of qualified timers are strictly the same.

3. The body of the body according to Section 35 (8) of the Kbt. Is excluded

4. Tenderer applies the Kbt. Article 75 (2) (e).

5. AK will pay 60 days per day during the period of time spent in Schedules IV.2.6 of the Recorder, subject to the Kbt. Article 81 (11).

6. The language of the eljaras is Hungarian. At the time, all documents and documents in foreign languages, you must enclose the responsible Hungarian translator with information.

7. Period of time for the selection of applications for a low ar or exam review resumes the timing of the survey (Section 81 (4)). For further information, Section 79, for the date of the contract, the Kbt. Paragraphs (6) and (8) of Article 131, and the time limits for eligibility are set in the Koezep-European-

governing. 9th In the above mentioned date and in the non-regulated quotations of the co-procurement document, and the Civil Code. I'm afraid of you.

10. The use of the EDF can be done by: https://ekr.gov.hu/portal/tamogatas; and http://nekszt.hu/tamogatas/ The EDF will be published on 27/2017. (XI.6.) MVM is based on NEKSZT Ltd., http://nekszt.hu. The system is artificialyou will not be able to find a niche in the context of using it.

11. The rescheduled period is the complexity of the project (planning and implementation) and the organizational problem. It is not possible to avoid problems. It is an epithet for a job, a job vacancy. In case of a finer constructor, the responsible person would not be able to be contacted.

12. The timekeeper tried and drank a tricky and unreasonable test driveessay, which includes the design contest. The designer is trying to propose an update to the full range of heresies.

13th Erectile Mode:

1. (controversial dialect): translate gold 2. (coefficient of interest): translate gold 3. (uninterrupted time): straight gold. Verification of point 2 is confirmed by the declarant who received itmust be entitled to use the specified landing location. The timekeeper must provide the place where the landing material from the individual knotboats is legally placed asphalted and the layout on which it is to be transported. The timekeeper must provide the place where the asphalt mixes and concrete mixes are delivered to theutvonaltervet. The lengths of the lines in km are to be rounded to one decimal place, the strengths given in the above-mentioned coefficient of mileage are based on their respective criteria. Pontagesar: 0 to 10 points. documents.

14. The timekeeper must provide a deadline for the coffin-drill's permission, justifying that he is entitled to utterancesenyseg vegzesere.

15. The time-table is given in Section III.2.2. the liability statement in question must be stated on the application or extension file. The use of the subpoenas of the declarations of the declarations is not a test. FAKSZ: dr. Czako-Salusinszky Reka (registration number OO987)
Internet address (URL): http://www.erd.hu

Documents

 Tender Notice