Procurement Summary
Country : Poland
Summary : Contract notice: Construction work
Deadline : 30 Aug 2018
Other Information
Notice Type : Tender
TOT Ref.No.: 25100597
Document Ref. No. : 311616-2018
Competition : ICB
Financier : Self Financed
Purchaser Ownership : -
Tender Value : Refer Document
Purchaser's Detail
Purchaser : ENERGETYKA CIEPLNA SP. Z O.O.
Office Name: Energetyka Cieplna Sp. z o.o.
Address: ul. Przemys?owa 2
Town: Skierniewice
Postal Code: 96-100
Contact Point: Krzysztof Filipek
Phone: +48 468336107
Fax: +48 468332423
Poland
Email :biuro@ecskierniewice.pl
URL :www.ecskierniewice.pl
Tender Details
Object of the contract
Construction work
Description: Contract notice: Construction work
Authority Type: Utilities entity
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45000000, 48000000, 51000000, 60000000, 71000000, 44000000, 42000000, 45000000, 48000000, 51000000, 60000000, 71000000, 44000000, 42000000
CPV Description: Construction work.
Software package and information systems.
Installation services (except software).
Transport services (excl. Waste transport).
Architectural, construction, engineering and inspection services.
Construction structures and materials; auxiliary products to construction (except electric apparatus).
Industrial machinery.
Dostosowanie istniejącego źrodła ciepła EC Sp. z o.o. w Skierniewice to emission standards going beyond the requirements of the IED Directive
The object of the order is to design, supply, build, commission and commission for use (in the "key" formula) a complete, modern installation of desulphurisation and dedusting of a group of four boilers, In water: WR-10 K1, WR-25 K2, WR-25 K3, WRm 29.07 K4 in Heat Engineering Ltd. in Skiernoiewicach in order to reduce the emission of harmful substances into the atmosphere by adjusting the sources of EC Sp. z o.o. Skierniewice to the required level of emissions exceeding the emission standards of the IED Directive, and meeting the requirements described in the BAT Conclusions of 17/8/2017
Main Site: Skierniewice, ul. Przemysłowa 2
The order includes:
1) Design and development of the completetechnical and technological documentation (including object-based inventory, measurement and testing of equipment) along with obtaining all formal and legal permits needed to complete
and transfer the investment to use.
2) Prefabrication, delivery, execution and assembly of the Turnkey Contract Object .
3) Performing technical and technological start-up of the installation.
4) Optimization of pr(5) Handover of the installation and facilities for operation
6) Handover of the installation
7) Development of as-built documentation
8) Development of guidelines for the operation of equipment and installations
9) Development of the operating instructions.
10) Delivery of spare parts within the warranty period (24 months).
11) Training of Zama personnel(12) Warranty service.
The detailed description of the subject of the Order has been specified in PFU.
The Ordering Party does not specify any specific conditions in this respect
The Ordering Party requires the Contractor to have funds or creditworthiness for an amount of at least 15, 000, 000.00 PLN. If Contractors submit documents containing data in currencies other than PLN, financial datae will be converted according to the average exchange rate of the National Bank of Poland (NBP) published on the NBP website on the day of publication of the contract notice in the Official Journal of the European Union. The Employer will accept the same course when converting any other financial dat
aInternet address (URL): www.ecskierniewice.pl
Documents
Tender Notice