BUDAPEST GYÓGYFÜRD?I ÉS HÉVIZEI ZRT. has floated a tender for Contract notice: Construction work. The project location is Hungary and the tender is closing on 18 Jul 2018. The tender notice number is 260721-2018, while the TOT Ref Number is 24281015. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Hungary

Summary : Contract notice: Construction work

Deadline : 18 Jul 2018

Other Information

Notice Type : Tender

TOT Ref.No.: 24281015

Document Ref. No. : 260721-2018

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : BUDAPEST GYÓGYFÜRD?I ÉS HÉVIZEI ZRT.
Office Name: Budapest Gyógyfürd?i és Hévizei Zrt.
Address: Sz?l? utca 38.
Town: Budapest
Postal Code: 1034
Contact Point: Dr. Balatoni Zoltán

Phone: +36 14524571
Fax: +36 14524501
Hungary
Email :kozbeszerzes@spabudapest.hu
URL :http://www.budapestgyogyfurdoi.hu/

Tender Details

Object of the contract
Construction work

Description: Contract notice: Construction work

Authority Type: Body governed by public law
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45000000, 09331000, 45000000, 45000000, 09331000, 42160000, 44221000, 42511110, 45261400, 09331100
CPV Description: Construction work - Solar panels - Boiler installations - Windows, doors and related items - Heat pumps - Sheeting work - Solar collectors for heat production - BGyH KEHOP epueletenergetikai fejleszt-si projektek - Reference Number: EKR000230182018

Vallalkozasi szerződes keretben " Budapest Gyogyfuerdői and Hevizei Zrt. Are responsible for KEHOP-5.2.8 construction projects. "Main Site-: Palatinus Strandfuerdő (1138 Budapest, Margitsziget hrsz. 23800/4)

In the framework of the authoritarian framework of "Budapest Gyogyfuerd- and Hevizei Zrt., KEHOP-5.2.8 constructed projects for energy efficiency development projects."

Resource 1: energetic developer of Palatinus Strandfuerdo the 5, 200 square meters of useful floor space, the main building and the Etterem building, the oesszeswith 125.7 kW output. They are located on a flat roof, the solar cells are monocrystalline and 300 W. The top of the Main Office is 230 pieces, and the top floor of the restaurant is 189 panels. The performance of the planned inverters installed: 2 x 20 kVA, 2 x 17.5 kVA, 1 x 15 kVA and 2 x 12.5 kVA outputs. It does not allow the electric connector to reach the halo-a. The construction work is carried out by the uninterrupted contract of the fuer, the workmen and the merchants are disturbed in the process, . and it can not be taken for granted by a farmer. against whom the Kbt.-Section 62 (1) - (2) and the Kbt. Section 63 (1) (c) of the Code is valid for every reason. Section 67 para. (1) is based on the provisional proof of the AT, which is the one-sided eu for the exclusion of exclusionary reasons. koezbesz. document (ESPD). If an AT is triggered, body massthis or any person's capacity is to be met, all of the organizations or persons concerned shall be required to submit forms and sub-assemblies. Section 67 (4) the AT must state that the author you will not be required to complete your application. Article 62 (1) - (2) and the Kbt. Article 63 (1) (c) of the Law on VATall-t.

A 321/2015. (X.30) Section 15 para. (1) based on AT from verifiable. or a mass organization, only the ESPD is being tested to justify the justification of the exclusionary grounds.

In the eyes of the alvids that do not take the case of the al. the AT must be certified by the Kbt. Section 67 (4) must be submitted. Article 69 (4) basisit is the way. it can be considered AT (ke) to be the most favorable in terms of the aspects of performance, before making a judgmental decision, for the purpose of providing justifications for exclusionary reasons. The AT- (s) invited to submit the verdicts must prove to the contrary that they are opposed to the excluded grounds. (X.30.) Government Decrees 1-8, 10, 12-According to - 16.

We pay attention to the Kb. Section 69 (11). • For exclusionary reasons and for the probable conditions of the trial, validates issued before the commencement of the trial may also be submitted (may be used). To the contrary proof to the contrary, the data content of light shall be borne by the time-consuming party in the queue. Article 64according to.

A 321/2015. (X.30.) Of Section 13 of the Criminal Code, the AT shall be obliged to attach to the application a copy of the registration note submitted to the Cegbirosag and the certificate of the cegbirosag altal. The AT must state the timing of whether it is in the process of litigation. The method. A negative statement must also be provided

The professional activity of the expert is valid.

The data are valid for the contractor and the validated mod:

The Kbt. Section 65 (1) (c) of the Law No 322/2015. (X.30.) Section 21 para. (1) based on the foundation of the epitomy industry. actors must be included in the Etv. according to the names of the building industry executives. Everythingyan host. (AT body, or a resident organization) must be included in the names of the persons who have signed the contract. he will complete his work as a builder of epithetics.

He is not a resident of Mo. the participant must be registered in the country of his / her resident or licensed, legitimate or organizational, kamayou must have a rai tag (verifies the records listed in Schedule XI of 2014/24 / EU European Parliament and Council Language).

Verification Mod: The Declaration included in the ESPD. In the above mentioned registers, In section 69 (11), the free auditing of the relevant data does not have the modalities of the register extract, v. the certificate issued or the documents in the register shall be justified by proof of the document. Article 69 (4)

Verification Mod: The Kbt. (1) of the Act on the Rights of the Applicant, in the appropriate manner in the appropriate working conditions of the Applicant, is provisionally certified in the Single European Case Law Documentto make a statement. The broker is the IV. a point α points to an appropriate suction path. The list of eligible candidates must be verified in accordance with the provisions below.

The list of validation criteria and the rovids will be presented at the minimum qualifying requirements. The time is uphe / she must prepare and submit the application using the EDF in accordance with the content and format requirements specified in the document. The timing shall include the time-limiting statement of the Kbt. Section 66 (2), (5), and the Kbt. Pursuant to Article 67 (1) and (4). In the event of a check-in period, you must attach the check-in date-with the content defined in the copyright documentation.

3. For the supplier of the Kbt. Section 66 (6) it is the basis for the checklist. the part of which he or she would like to claim alvall, in the case of these cases, the subprojects that are known at the time of the publication. The official list of qualified time-takers is strictly the best in the Penzuegyes and in the economy, something(P / 1, M / 1, M / 2).

5. Any member of the host who may be a provider in a given contract award procedure may use the EDF to make an introductory application in connection with the summons and the content of the document. Hianypotlas: the Kbt. Article 71 (1) to (10) of the ActAccording to the above, the fact that the Kbt. Section 71 para. (6), and shall not order any other Hianypotlast in the chariot defined therein. The timeline shall include any other declarations, supporting documents and other documents not included in the application, which are included in the documentation and the Kbt. REQUIRED.

8th Time-keepers have to put professional times in their time. THE(9), the professional qualification of the specialists involved in completing the qualification (2). It is not possible to print a host organization (project portfolio)

10. A trial period of 2 months = 60 days.

11. Yes. Section 75 (2) e): apply.

12. The winner of the winner is covered by his contractual title, (1st rf: min 150 million HUF / year and 30 million HUF / person; 2nd rf: min 150 billion HUF / year and 30 billion HUF / person) 3. rf .: minimum 250 million HUF / year and 50 million HUF / person; 4. rf: 250 million HUF / year and 50 million HUF / person; 5 rf: 200 million HUF / year 50 million HUF / person; 6th rf: minimum 150 million HUF / year and 30 millio Ft / arm) should be available.

13. There is also an upper limit of the adhato point of the points of view according to the points of view: 0-100 points. Methods are described in the document.

14. About Us Section 134 (4) shall be declared in due time. In Section II.1.5 and II.2.6, the one-for-forint denominated earnings are only credited to rogues due to the announcement of the caller.-The timeline must include a statement that the job vacancy is kept in order, the accident and firewall passwords must be observed and enforced. The winning AT must have the MSZ EN ISO 14001: 2015 (v all-in-one) coerce of yours before the contractor. as well as the requirements of the MSZ EN ISO 50001: 2012 (v.tin. with energy consumption). Certificate.

18th In case of a request for a timely or legally valid organization, if the EDF is not general, all the reputable and legitimate organizations are responsible for the declaration of registration and for the exclusionary reasons, then use this(document III / 1 is only a listener),

- declarations for exclusionary reasons (document III / 2, which is a list of prospective and legally validated organizations).

19. FAKSZ: dr. Orsolya Barna, registration number 00199.

20. The details of the time schedule are fully covered with the test stripsm


Internet address (URL): http://www.budapestgyogyfurdoi.hu/
Directive: Classical Directive (2014/24/EU)

Documents

 Tender Notice