KECSKEMÉT MEGYEI JOGÚ VÁROS ÖNKORMÁNYZATA has floated a tender for Contract notice: Building construction work. The project location is Hungary and the tender is closing on 08 Jan 2020. The tender notice number is 577581-2019, while the TOT Ref Number is 38692681. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Hungary

Summary : Contract notice: Building construction work

Deadline : 08 Jan 2020

Other Information

Notice Type : Tender

TOT Ref.No.: 38692681

Document Ref. No. : 577581-2019

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : KECSKEMÉT MEGYEI JOGÚ VÁROS ÖNKORMÁNYZATA
Office Name: Kecskemét Megyei Jogú Város Önkormányzata
Address: Kossuth tér 1.
Town: Kecskemét
Postal Code: 6000
Contact Point: Balogh Zoltán

Phone: +36 76513567
Fax: +36 76513538
Hungary
Email :balogh.zoltan@kecskemet.hu
URL :http://www.kecskemet.hu

Tender Details

Object of the contract
Building construction work

Description: Contract notice: Building construction work

Authority Type: Regional or local authority
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45210000, 45210000, 45400000, 45300000, 45210000, 45400000, 45300000
CPV Description: Building construction work

Building completion work

Building installation work

Creating a new family and child welfare center

Reference Number: EKR001280582019

"Creating a new family and child welfare center in Kecskemet on TOP-6.6.2-15-KE1-2016- 00002 Identity Project Project "

Main Site: 6000 Kecskemet, Hrsz: 10208/24 (former Rudolf Barracks Teruelete-Olimpia Streeta feloel)

"Establishment of a New Family and Child Rights Center in Kecskemet within the framework of project TOP-6.6.2-15-KE1-2016-00002"

The winner of the Contractor is to build a new Family and Children`s Center in Kecskemet. Existing monumental construction, reconstruction and expansion of monuments, and related environmental management

Epithelial construction of the epitees:

- 1 059, 86 m floor area (990, 71 m useful floor area 69, 15 m indoor-open space) construction of the building, of which 783, 52 m monument restoration and reconstruction, 276, 34 m expansion, new epite,

- 3 913 m terrestrial landscape, of which 1 728 m encrusted ridges, 2 185 m zoeldfeluelet.You should not be liable for any adverse effects on the epithelium.

- New epueleters for concrete slabs, existing m

- Wall structures

44 cm curb front and 30 cm internal load bearing

- Hianyzo wall sections, and wall-high technology insulation against subsequent soil moisture (181 circ. m). (Ceiling walls are not insulated due to the monument`s drafts!)

- Walls to be laid 10 cm or 12 cm

insulated

- Existing, remnant epuelets custom-made wood-fired arrow corners, new epaulets installation of aluminum windows and glazing

- Colored facade (1 352 m)

- Refrigerated system: - Paraffin cooled system - - Heating system Ventilator: natural and artificially fashionable, epueletically half-flush

- Insideinstallation of LED lightning in the sky

- Installation of fire alarm and property system

- Creation of Zoeldfeluelet (2, 185 m)

- Creation of public transport areas, coverings (1, 728 m)

Number of monuments:

Rudolf Barracks monument number: 10663h

Legen 16968

Little Rifle Shooter ID: 16973

Shower and Laundry Room ID: 16975

Cloud III.1.3) M / 1. to inFormulations:

- Ultra insulated with injection technology 181.14 ker. m kessuel,

- corrugated slab roofing 343.44 m kessuel,

- renovation plaster 1978.15 m kessuel,

- gypsum plasterboard ceiling 645.07 m kessuel,

- 1 2 700 m / h capacity for keruel installation of the highest capacity machining machine.

The design, origin, and type of reference in the overhead and co-acquisition documents can only be interpreted as meaningful and co-operative in the subject. The bidding ability is justified by the suitability and exclusion reasons as well as by the copurchase technical specification for mods about 321/2015. (X. 30.) of the Government of the Republic of Hungary (hereinafter referred to as: "Cr.") Accepts all equivalent rooms on that basis.

that the successful tenderer must reach the contractor within 15 months of receiving the contractUp to 100% technical capacity, whereby only the cauldron can be loaded (if the cauldron is unavailable). (1): The tenderer shall provide in his proposal the CXLIII. greenery (hereinafter: Kbt.)In the course of the second round of coeservice procurements, when submitting an offer, In accordance with Chapter II, you must pre-certify that you do not belong to the Public Procurement Act by submitting the Single European Co-Procurement Document. Article 62 (1) and (2).a rapper against whom the Kbt. Any of the grounds for exclusion listed in Article 62 (1) to (2) shall apply.

The attested certificate is:

In accordance with Chapter II, you must pre-certify that you do not belong to the Public Procurement Act by submitting the Single European Co-Procurement Document. Article 62 (1) and (2). Article 69 (4) to (8)it is based on the III. In accordance with Chapter II, you must prove that you are not subject to the exclusions provided for in the Procedure. Article 62 (1) to (2) shall exclude a sub-contractor. For subcontractors who do not take the certificate of suitability, b. Submits a declaration pursuant to Article 67 (4). Pursuant to Article 67 para. The declaration referred to in Article 67 (1), and the certificates shall be submitted to that organization when requiredExcept for those who are eligible, they must justify their compliance with the applicable eligibility criteria in the same way as the required Certificate Requirements.

Reasons for Exclusion: also unity wpez, and as intended, can be an epuelet. It is not possible to complete the planned construction work with the planned construction work, with the construction of an epuelet construction and an electrical system designed for the construction of a technical system.it requires a single technical manager and coordinator from the contractor. Workflows are closely intertwined, where no exact boundary can be drawn in the forests. In the case of broken rape, there would be a significant chance that the cohesive tasks to be completed would lose the exact boundaries and some of the work compartments to be eliminated.They would have no master in any of the other assignments.

The dedication to detail would also have a negative impact on the guarantor`s point of view, since certain tasks are warranted by the fact that the associated work slots are dedicated to that particular task. The oessefull, featured task system rationally excludes a single general warranty.This requires a single technical manager to coordinate the workflow in the environmental management process. The organization of landscaping and gardening work is greatly influenced by the organizational activities (procession, sourcing, material and waste detection, material handling, transportation, etc.) of the project. In the case of a Kueloen business contract, it ensures a simultaneous working spacethe source of the problem could be. Submitting a post-work space to the project would cause the project to be overdue. In the second round of coeservatory procurements, at the time of the submission of the offer, in the II. In accordance with the provisions of this chapter, you must pre-certify your compliance with the Public Procurement Act by submitting the Single European Co-Procurement Document. 65 of the Ajanl

P / 1.

The Kbt. Pursuant to - 65 (1) (a) and - 19 (1) (b) of the Criminal Code, a statement of the business or the predecessor`s legal entity for the completed three business days preceding the day (if the country of establishment of the Offeror)

If the Ajanlattan eater does not have an accountancy record in accordance with accounting laws for the entire period required by the Bidder, because he or she commenced a period of study after the commencement of the period, with the ability to certify or refurbish the collections of monuments. In this case, the offerer is artificialDuring the term, the general sales tax on co-branded supplies must outweigh or exceed the values defined in the prospectus. Section 65 (1) para. (a) and - 19 (1) (c) of the Act on the basis of a statement issued by the competent authority three days prior to the day of deliveryGeneral sales tax on the total and co-requisite items (refurbishment and / or upgrading and / or upgrading of monuments) eti ev according to the date on which the offerer started and / or began the exhibit. . He does not possess the document referred to in paragraph 1 of this Article because he works in a legal form which, in respect of him, speaksIt is not possible to submit a molo or a declaration of income or any other statement or document deemed appropriate by the competent authority in lieu of the required co-operative and proof-of-use model. This adjunct Provider`s quest for additional information is proving to work in a legal form thatin this regard, the submission of the Declaration of Income is not possible and seek information instead of the required co-operative and verification modality in a suitably validated manner. Article 69 (4) and (6) invoke the certificates submitted by the Contracting Authorityyou can ignore them and it is sufficient to involve them only before the final lezaro doentes, with the exclusive consideration of the tenderers who have sought to call the Certification Authority to enter the certificates. If the Bidder has submitted the certificates earlier, the bidder will not call the Bidder to retry the certificates, but will treat it asthe previously submitted certificates would have been submitted to the Proceedings of the Proceedings and, as the case may be, ordered or sought clarification. and the conditions of pencil and economic fitnessQualified reviewers have defined the criteria for inclusion in official lists of qualifying criteria to be more stringent. The offer is made to the offeror by Kbt. Section 66 paraIt shall be prepared and submitted in accordance with the content and formal requirements specified in the documents before the deadline for submission of tenders has expired. The offer must include Kbt. - 66 (2), (5).

4. The offer must include the express statement of the offeror in Kbt. Article 65 (7). Attach a negative statementszuekseges!

5th In the event of a pending listing, the offeror must enclose the listing request submitted to the company and a certificate of its registration with the company. The timing of the hianypotlas opportunity is Kbt. Article 71 (6) secures it. . Benchmarking draws attention to Article 11 (2) to (3) ECREser. In case of a calculation error, the time limit is Kbt. According to Section 71 (11), jar el.

7. From the results of the procedure the power of time is Kbt. According to - 70, at the latest on the day prior to the expiration of the tender offer, the tenderer shall inform the tenderers in writing, subject to the provisions of the Kbt. - 79 (1) to (2).

8. Commitment calls your attentionet al. - 73.5.

9. Bidding capacity does not require or permit the creation of a project partnership for either oenallo or koezoe bidders. Subcontractor`s proceeds of the Kbt. It is possible under - 138.

12. Point IV.2.6) concerning the Tentative Grant is set out in section Kbt. It shall be interpreted in accordance with the provisions of - 81 (11).FAX: dr. Simon Krisztian, registration number 01065.

14. Winning bidding test on 322/2015. (X.30) Reg. - 26, to extend the existing liability insurance contract to cover the term of the contract test, or to extend the existing liability insurance to the above-mentioned limit by the time of the contract test at the date of the contract test, HUF 100, 000, 000 / faculty or 200, 000, 000 HUF / year. Testimonial testand suggest attaching a coarse-grained coarse-grained coarse-grained coarse-grained coarse-grained coarse-grained coarse-grained body. We invite the Honorable Adviser to note that you may not modify or add to the quantities and quantities contained in the issued, unpaid coals. If the mast is replaced by the specific products in the coin-opto prove the equivalence of the halls given on the basis of Article 46 (3) - (4) of the Cr. The recommendation applies Kb. Article 81 (4) and (5). The contractor must have MSZ EN ISO 9001 and ISO 14001 and ISO 28001 v. with these 321/2015. (X.30.) According to Article 24 (3) Krduly certified by a certificate, v. with other evidences of equivalence systems. The Bidder draws attention to the fact that the business secrets of the documents attached to the offer will be disclosed exclusively to Kbt. It is possible according to the requirements of - 44. The preferred location of the business secret document uses the function provided in the ECF. (ECR 1- 1 (4)). The offeror shall attach a justification to the confidential document containing the trade secret, stating in detail why the disclosure of the information or data in question and the manner in which it would cause a donkey to fall foul. The power of appeal calls attention to the fact that - 19 (10) of the Cr.In the case of erroneous procedures, the economic operator must state the place of electronic reporting under the accounting rules in the Single European Co - Procurement Document. Timeout does not provide options.

35. There is no suggestion you make a suggestion.

FAX: dr. Simon Krisztian Ervin, 01065.


Internet address (URL): http://www.kecskemet.hu

Documents