Procurement Summary
Country: Hungary
Summary: Contract notice: Architectural design services
Deadline: 11 Dec 2019
Posting Date: 04 Nov 2019
Other Information
Notice Type: Tender
TOT Ref.No.: 37687908
Document Ref. No.: 520127-2019
Competition: ICB
Financier: Self Financed
Purchaser Ownership: -
Tender Value: Refer Document
CPV Classification
71220000 - Architectural design services
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Object of the contract
Architectural design services
Description: Contract notice: Architectural design services
Authority Type: Regional or local Agency/Office
Contact Nature: Services
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 71220000, 71220000, 71220000
CPV Description: Architectural design services.
Purchasing Design Services Tokaj
Reference Number: EKR001321302019
Winning Contractor's Responsibility for Completing Construction Designs as Specified in the Co-Purchasing Documents and Completion Epitope Permit; hrs: 600/6 600/9600/19, Main Square (hr 1.2), Main Street (a section of Bethlen Gabor and Rakoczi streets hr 44, 266); Dozsa Gyoergy Street (hr: 138), Zako koez (hr: 309)
Main Site: Tokaj City
The successful tenderer is responsible for completing the completion of the execution plans as outlined in the Co-Acquisition Documents and in the final epitope permitfor k: Tokaj, Bodrog Coastal Setany; hr: 600/6 600/9 600/19, Main (hr 1.2), Main Street (a section of Bethlen Gabor and Rakoczi streets hr 44, 266); Dozsa Gyoergy Street (HR: 138), Zako Koez (HR: 309)
Designer's task is to provide the necessary permits and to obtain the necessary professional and co-operation consultants, and to obtain the necessary contributions.all design and documentation costs are borne by the Designer, the customer is responsible for paying the Sixth Degree.
Toerin case of defects in the design, in case of defects in the design, or in case of problems arising in the course of execution, in the event of problems in the execution of the plan, preparation, furthermore the excofficial performance, design contributions, and declarations for the completion of the technical work to be completed. On these, the designer's credentials are the glazing of the peer examinations and the statement about them. The supervisor is required for each subject.
the tinnitus requirements of the tinsel are non-exclusive:
1. Construction work section (with consonants, detail drawings, hinged plans ...)
2. Structure working section
3. Preparation of landscaping work part and construction plan
4. Preparation of working part plan and specialization plan
5. Preparation of Episode Electricity Parts and Specialization Design
6. Weak ash partition and network installationmaking this plan
7. Fire Alarm Network Working Part
8. Co-op working section
9. Road and pavement working section
10. Water workshops
11. Landscape Management
12. Surveying Surveys
13. Soil Mechanics Working Part
14.Manufacturing and Maintenance Working Parts
15. Preparation of Work Safety and Health Plan
18. Koezvilagitas working hours
19. Gardening workshops
20. Akadalymentwork session
22. Restoration and Licensing Working Lot
21. Preparation of co-investment (full-armed, non-developed co-investment)
22. All design, expert work that is relevant to the high level of execution and concession.
Main Designer Locations:
1) Kossuth Square - Main Square
The complete refurbishment of the upper and upper areas is completed
2) Giving St. Erzsebet the top of the main square with a statue of St. Sergeant
4) The statue of St. John of Nepomuk, Regi, is located on the Boduel coastline setu.
4) Main street, renovation and reconstruction of 19 home facades. Roof ceiling replacement, facade plaster repair, coloring, labaz
5) Ovarosi Coastal Setany
1400 meters complete area planning toerten. Steps to refurbish staircases, recreational spaces to refurbish with furnishings. Toebblet machinery for parking garages
Details in the Co-Procurement Documents
No time to processemployee (hereinafter AT), or sub-contractor, and may not certify suitability as an economic operator who is a member of Kbt. Section 62 (1) - (2) is subject to the exclusion grounds. The Kbt. Pursuant to Article 74 (1) (b), the ADP shall subcontract to the AT, the subcontractor or the entity certifying the suitability of the entity, which shallok the procedure has been going through. Favorite Verification Module: AT 321/2015. (X. 30.) Govt., Articles 8-16 shall be applicable, accordingly, AT shall, by submitting the Single European Co-Procurement Document (EEKD), certify in advance that it does not belong to the Kbt. Article 62 (1) to (2) shall be subject to the authority of the Government. I was included in the Single European Co-Procurement Document (EEKD)getting the certificates serving your desk into Kbt. Article 69 (4) to (7) shall apply. Certificates are issued to AT by Resolution 321/2015. (X. 30.) Government Decree III. In this chapter, you must submit as specified; No. 321/2015. (X. 30.) on the basis of Article 15 (1) of the Decree of the Government of the Republic of Hungary, only the Uniform EuropeanA Co-Procurement Document (EEKD) must be submitted to Kbt. Justification of the reasons for exclusion listed in - 62 (1) - (2). In other respects AT suggests Kbt. Pursuant to Article 67 (4), to declare on its honor that it does not subscribe to the Kbt. Article 62 shall exclude a subcontractor. The Kbt. Section 62 (1) points a), b), e), h), j), I), n) and p)the fixed period shall always be counted from the date of the non-review of exclusion. The Kbt. In relation to Article 62 (1) (k) (kb), a statement of the tenderer shall be attached. The Kbt. With respect to Article 62 (1) (k) (kc), the AT statement shall be attached. The Kbt. 62 (1) (b): AT established in HUNGARY for ATsthe timeline is checked from the non-affiliated tax database. Disqualifications for HUNGARIAN COHESION from the non-COHESION tax database are also verified by the timeliness. If the economic operator is not listed in the database, the relevant tax office certificate or single tax certificate must be submitted. Not established in HUNGARY for AT, established in ATA certificate shall be submitted to the appropriate authorities of the country in which he / she is established. If the economic operator in HUNGARY does not carry out tax-deductible activities, a certificate from the National Tax Administration shall be provided. For more information, References refer to Decree 321/2015. (X. 30.) Korm. For Exclusion Causes and Eligible Requirements, Commencement of Co-PurchasePre-issued certificates may be retrieved (used) for as long as the contents of the certificate or records are correct. Unless otherwise proven by the date, the content of the data is claimed by the tenderer in his statement to that effect. Wherever this section mentions a reviewer, coezoeists should also be mentioned. Self-cleaning: The power of dedicationzbt. - 64 (1) - (2).
AT shall, by virtue of - 322/2015 (X.30.) Government Decree -8 (1), be required to have a design service related to the construction of the Epitex, and professional chamber in memos, respectively. a non-Mo. host. listed in the country of establishment or have a permit, license in the country of establishmentor with organizational, chamber tags.
Awareness of Kbt. Subject to the provisions of - 65 (2), the present proceedings do not impose a pseudo-economic suitability test. The procedure is recommended by j. FU. adasa, the Kbt. 54 of the AT, as set forth in Art. Allowances must be made available to the AK. The bizt. cost: $ 500, 000 for the required pencil nail in AjanPaying with the following deposit account: Magyar Allamkincstar 10027006-00340777-00000024. The contributor shall be advised of the subject matter hereof and of the words "Commissary Commissions". Commissions may be executed in the form prescribed by Section 54 (2) of the Kbt. a - 57 of the Kbt.According to paragraph 2, at least one AT or a sub-entity named in the offer must cross the ECR. You cannot delegate documentation. K also provides documentation in an editable format. Otherwise, the content of the non-editable format documentation is mervado.
3rd Documents and declarations to be attached to the offer are to be found in the Doctrine of Religionumentacio included. The language of the procedure is Hungarian.
4th K Supplementary Information Kbt. - 56 of the Act. The outs. cheese can be cross-checked exclusively on the EKR system. AK is the outsider. The cheese is intercepted by the ECR system for all ATs who have indicated their interest in the ECR system. The EKR publication is published in 27/2017. (XI. 6.) of the Ministry of Agriculture and Rural Development on the basis of NEKSZT Kfti (http://nekszt.hu), thousands of systems for AKO with a workbook, utility. do not offer any cheese.
5th For those who make a Koezoes offer or an oenallo offer, the time power does not make it possible to set up a business organization (project partnership).
6th Eligible minimum conditions and required means of proof as defined in points III.1.3)Those who make official entries are subject to more stringent qualification criteria.
7th Timeline for Kbt. - 75 (2) (e) does not apply.
8th AK a Kbt. - 81 (4) para. As stated above, the report on the unexpectedly low price of the exam is used to reduce the number of offers and to apply it in case of failure. Procedure.
FAX 9: Istvan Hamos, Register: 00052 E-mail: [email protected], Lev.c: 1116 Bp, Temesvar u. 20.
10. Bidding on the suggestions of Kbt. Article 76 (2) (c) best scores are awarded in gold, as follows:
Score: 0-100. .-fifth Aspects (professionals):straight cut. ([KE 2019 Dec 2019; 4.6.2019] Reverse Gold Volume 1 Annex 1 (aa) and Straight Gold Volume 1 Annex 1 (b).). Where AK is Kbt. Section 77 para.ontszamokat. Under the expert's experience, they have a superior experience in the field of fitness.
11th The contract with the successful Bidder has been concluded for a limited period of time, which shall cease to be in force on the date of the contract, and shall terminate on the date of completion of the construction of the epithelium, which has been exhausted. THE2.7. The time limit referred to in paragraph 1 is the time limit for completion of the complete design documentation for the project, which shall be 90 working days, calculated on the basis of the contract.
12th The contract examiner is required by the Designer to possess, in respect of the activities, design faults, design risk insurance (all risk type) with a minimum of 2, 000, 000 forints and a minimum of 10, 000, 000 forks per year. Details in the Documentation
Internet address (URL): http://www.tokaj.hu
Documents
Tender Notice