MESTARITOIMINTA OY has floated a tender for Contract notice: Architectural, construction, engineering and inspection services. The project location is Finland and the tender is closing on 18 Jun 2019. The tender notice number is 232186-2019, while the TOT Ref Number is 33096319. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Finland

Summary : Contract notice: Architectural, construction, engineering and inspection services

Deadline : 18 Jun 2019

Other Information

Notice Type : Tender

TOT Ref.No.: 33096319

Document Ref. No. : 232186-2019

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : MESTARITOIMINTA OY
Office Name: Mestaritoiminta Oy
Address: Mannilantie 43
Town: Järvenpää
Postal Code: 04400
Contact Point: Antti Nikkanen

Phone: +358 409222007

Finland
Email :antti.nikkanen@mestaritoiminta.fi
URL :http://www.mestaritoiminta.fi

Tender Details

Object of the contract
Architectural, construction, engineering and inspection services

Description: Contract notice: Architectural, construction, engineering and inspection services

Authority Type: Other
Contact Nature: Services
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 71000000, 71320000, 71000000, 71320000
CPV Description:

Engineering design services.

Harjula School New Building and B-wing Home Improvement as a Home For Home, HVAC Design

Mestaritoiminta Oy builds a new building at Harjula School in Jaervenpaea, Harjula School, which will function as a 3-series elementary school and pre-school. The plot was demolished at a school built in the 1960s and 1980saajennukset. The original B-part of the 1930s is basically repaired by the 4-ganged limestone home. A plot plan change is being initiated on the site, where part B is protected by a town plan. The size of the new building is approximately 4, 900 brm and the size of the building to be renovated is 1, 090 brm. According to the investment proposal, the estimated cost of the new project is approximately EUR 16.5 million. EUR (VAT 0%) and project to be upgradedEstimated price approx. EUR (VAT 0%).

Main Site: Verkkotie 12

Purchase includes the HVAC design of the item. The goal of the subscriber is to create a partnership-based development model for excellent performance rewards. In the project, a milestone, or milestone target model, is being used. The assessment is based on the success of the entire planning team. The prerequisite for this is that you do not get the project doneprocessors have committed themselves to a similar procedure. The design factory outlet will include the factory casts with its appendices and its appendixes in the special invitation to tender, in accordance with section 120c-e of the Land Surveillance and Building Act.

The project is in the planning phase for the eligibility requirements (https://www.pksrava.fi):

for renovation: demanding, (educational buildings and homeowners)

newfor construction: demanding (educational buildings and homeowners).

The provider gathers and designates a design team with a responsible HVAC designer, HVAC designer, and RAU designer alerts for the deputies. Responsible HVAC Planner for New Construction is responsible for co-ordinating HVAC design for new construction and refurbishment systems and equipmenta, including building automation.

The building as a whole is designed with data modeling. The subscriber prepares a B-part inventory model as the basis for designing when the design is launched. The site follows the Dry Chain10 procedure (www.kuivaketju10.fi) and the Healthy House Criterion Information, where applicable (Criteria for more detailed description at the planning start meeting) where Iinitiated the requirements for the design of artwork. The assignment includes participation in the preparation of the moisture management plan in accordance with the Dry Chain10 procedure. The new construction of the project will be carried out as a co-operative project management contract and a basic renovation of the B wing as a shared or total contract. quotation material with attachments.


Internet address (URL): http://www.mestaritoiminta.fi

Documents

 Tender Notice