Procurement Summary
Country : Finland
Summary : Contract notice: Architectural, construction, engineering and inspection services
Deadline : 18 Jun 2019
Other Information
Notice Type : Tender
TOT Ref.No.: 33096319
Document Ref. No. : 232186-2019
Competition : ICB
Financier : Self Financed
Purchaser Ownership : -
Tender Value : Refer Document
Purchaser's Detail
Purchaser : MESTARITOIMINTA OY
Office Name: Mestaritoiminta Oy
Address: Mannilantie 43
Town: Järvenpää
Postal Code: 04400
Contact Point: Antti Nikkanen
Phone: +358 409222007
Finland
Email :antti.nikkanen@mestaritoiminta.fi
URL :http://www.mestaritoiminta.fi
Tender Details
Object of the contract
Architectural, construction, engineering and inspection services
Description: Contract notice: Architectural, construction, engineering and inspection services
Authority Type: Other
Contact Nature: Services
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 71000000, 71320000, 71000000, 71320000
CPV Description:
Engineering design services.
Harjula School New Building and B-wing Home Improvement as a Home For Home, HVAC Design
Mestaritoiminta Oy builds a new building at Harjula School in Jaervenpaea, Harjula School, which will function as a 3-series elementary school and pre-school. The plot was demolished at a school built in the 1960s and 1980saajennukset. The original B-part of the 1930s is basically repaired by the 4-ganged limestone home. A plot plan change is being initiated on the site, where part B is protected by a town plan. The size of the new building is approximately 4, 900 brm and the size of the building to be renovated is 1, 090 brm. According to the investment proposal, the estimated cost of the new project is approximately EUR 16.5 million. EUR (VAT 0%) and project to be upgradedEstimated price approx. EUR (VAT 0%).
Main Site: Verkkotie 12
Purchase includes the HVAC design of the item. The goal of the subscriber is to create a partnership-based development model for excellent performance rewards. In the project, a milestone, or milestone target model, is being used. The assessment is based on the success of the entire planning team. The prerequisite for this is that you do not get the project doneprocessors have committed themselves to a similar procedure. The design factory outlet will include the factory casts with its appendices and its appendixes in the special invitation to tender, in accordance with section 120c-e of the Land Surveillance and Building Act.
The project is in the planning phase for the eligibility requirements (https://www.pksrava.fi):
for renovation: demanding, (educational buildings and homeowners)
newfor construction: demanding (educational buildings and homeowners).
The provider gathers and designates a design team with a responsible HVAC designer, HVAC designer, and RAU designer alerts for the deputies. Responsible HVAC Planner for New Construction is responsible for co-ordinating HVAC design for new construction and refurbishment systems and equipmenta, including building automation.
The building as a whole is designed with data modeling. The subscriber prepares a B-part inventory model as the basis for designing when the design is launched. The site follows the Dry Chain10 procedure (www.kuivaketju10.fi) and the Healthy House Criterion Information, where applicable (Criteria for more detailed description at the planning start meeting) where Iinitiated the requirements for the design of artwork. The assignment includes participation in the preparation of the moisture management plan in accordance with the Dry Chain10 procedure. The new construction of the project will be carried out as a co-operative project management contract and a basic renovation of the B wing as a shared or total contract. quotation material with attachments.
Internet address (URL): http://www.mestaritoiminta.fi
Documents
Tender Notice