SCHWEIZERISCHE BUNDESBAHNEN SBB, INFRASTRUKTUR, MULTIPROJEKTE has floated a tender for Contract notice: Architectural, construction, engineering and inspection services. The project location is Switzerland and the tender is closing on 28 Sep 2018. The tender notice number is 354586-2018, while the TOT Ref Number is 25792460. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Switzerland

Summary : Contract notice: Architectural, construction, engineering and inspection services

Deadline : 28 Sep 2018

Other Information

Notice Type : Tender

TOT Ref.No.: 25792460

Document Ref. No. : 354586-2018

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : SCHWEIZERISCHE BUNDESBAHNEN SBB, INFRASTRUKTUR, MULTIPROJEKTE
Office Name: Schweizerische Bundesbahnen SBB, Infrastruktur, Multiprojekte
Address: Bahnhofstraße 12
Town: Olten
Postal Code: 4600
Contact Point: Reto Colombo



Switzerland
Email :einkauf.bauprojekte.mitte@sbb.ch
URL :https://www.simap.ch

Tender Details

Object of the contract
Architectural, construction, engineering and inspection services

Description: Contract notice: Architectural, construction, engineering and inspection services

Authority Type: Utilities entity
Contact Nature: Services
Procedure: Open procedure
Document: Contract notice
Regulation: Agreement between the European Union and the Swiss Confederation
Award criteria: The most economic tender
CPV code: 71000000, 71000000
CPV Description: Architectural, construction, engineering and inspection services.

General planner Langenthal station, implementation of BehiG Mittelperron and widening of the Bahnhofpassage

Basic order: Adjustment of the Mittelperron from P35 to P55. This requires a broadening of the Perrons, adaptation of the staircases and the Perronhauptzugaenge. Replacement perforated roof by SBB standard roof. 1: 1 lifter set. At the track systemThe geometry of track 3 has to be adapted and an additional lane change is to be built in.

Main Site: Langenthal Station

Basic order: Adjustment of the central locking device from P35 to P55. This requires a broadening of the Perrons, adaptation of the staircases and the Perronhauptzugaenge. Replacement perforated roof by SBB standard roof. 1: 1 lifter set. In track systems, the geometry of track 3 is ato adapt and an additional lane change is built in.

Option: Broadening station passage with ramps for pedestrians and cyclists, creating new social space for the Aare Seeland mobil AG.

On EK 1:

N1:

1 project reference with comparable complexity and task for each of the following divisions:

- construction phase planning, geomatics, civil engineering, civil engineering Tragkonstrauctions, architecture, rail access, lift planning, electrical planning, HVACS and MSRL planning, cable planning

Several sections can also be identified within the same project. The reference projects must be completed or realized to a significant extent. If the required reference comes from a sub-planner, the provider has to add a confirmation from the sub-plannerTo declare the turnover of the last 3 years in the relevant business unit (s)

Concerning EK3:

N3:

Copy of the certificate of the quality system according to ISO 9001 or with non-certified in-house quality system Description of the system. (In the case of planner associations this proof is only available from the lead member eg

Partial offers are not permitted.

Conditions for non-WTO member countries: None.

Terms and conditions: According to tender documents.

Negotiations: subject to change.

Principles of procedure: The contracting authority only awards public service contracts in Switzerland Suppliers who observe compliance with the Arbeitsschutzbestimconditions and conditions of employment for men and women and equal pay for men and women.

Other information: The award of the contract depends on the receipt of all permits required for the completion of the work and on the credit release of SBB AG. Preliminary: The company Helbling Consulting Bauplanung AG in 8048 Zurich, the present Beschaffungsveis not allowed on the basis of its prior The company tbf Partner AG, located in 3011 Berne, represents the city of Langenthal within the scope of the ESP and will not be admitted due to its preliminary reference to the present proceedings. Subsequent companies have provided inputs in connection with the present project and with this mandate their missionclosed: The completed project documents ("Study Report Technical Report, Variants 1A (1B2 / 1B2)" and "Technical Short Report Widening of the Railway Station Passage") are included in full in this task description. The deadline for the submission of a possible offer by the pre-occupied companies including all possible parent, subsidiary or sister companies ends on 18.9.2018. For all other providers the deadline according to SIMAP chapter 1.4 applies. Based on these measures, the following pre-assigned companies are admitted as providers (Art. 21a VoeB): CES Bauingenieur AG, 5001 Aarau BSB Partners, Engineers and Planners, 4702 Oensingen weberbrunner architekten ag, 8045 Zuerich EBP Switzerland AG, 8032 Zuerich Kuhn Landscape Architects, 8004 Zurich-IUB Engineering AG, 3007 Berne.

Remedial Remarks: Remedial Reminder: According to Art. 30 BoeB, a complaint in writing to the Federal Administrative Court, PO Box, 9023 St. Gallen may be lodged within 20 days of publication. The complaint must be filed in duplicate and must include the requests, their reasoning with indication of the evidence as well as the signature of the applicantrepresentative or their representative. A copy of the present publication and available evidence must be enclosed.

Final date / comments: The postmark (company franking not valid as a postmark) or barcode voucher of a Swiss post office or the receipt of a Swiss diplomatic or foreign mail is decisiver consular representation. When handing over the offer to a diplomatic or consular mission of Switzerland abroad, the provider is obliged to confirm receipt of the corresponding representation by e-mail (einkauf.bauprojekte.mitte@sbb.ch) to the SBB AG by the deadline of submission of the offer Report. Offers can not be delivered personally, respectively-will not be accepted on the spot. Deadline for submission: 18.9.2018. Please note the note under point 4.5 for pre-occupied companies. The following information should be noted on the envelope: "Please do not open / General Planner Bahnhof Langenthal".

Remarks (deadline for written questions) Questions regarding the invitation to tender must be sent in writing by 23.8.2018 at the latest on the Forum on www.simap.ch. Answering the questions (without naming the questioner) will be made available to all providers on 30.8.2018 on www.simap.ch. No telephone or oral information is given.

National Reference Publication: Simap dated 9.8.2018, doc. 1031747 Date requested for written questions until: 23.8.2018.

Tender documents areavailable from 9.8.2018

Conditions for obtaining the ...


Internet address (URL): https://www.simap.ch

Documents

 Tender Notice