ABTEILUNG DIREKTIONSGESCHÄFTE has floated a tender for Contract notice: Architectural, construction, engineering and inspection services. The project location is Switzerland and the tender is closing on 08 Jan 2018. The tender notice number is 454586-2017, while the TOT Ref Number is 18255786. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Switzerland

Summary : Contract notice: Architectural, construction, engineering and inspection services

Deadline : 08 Jan 2018

Other Information

Notice Type : Tender

TOT Ref.No.: 18255786

Document Ref. No. : 454586-2017

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : ABTEILUNG DIREKTIONSGESCHÄFTE
Office Name: Abteilung Direktionsgeschäfte
Address: Mühlestraße 2, Ittigen
Town: Berne
Postal Code: 3003
Contact Point: Mobility Pricing - TP Wirkungsanalyse, nicht öffnen - Offertunterlagen



Switzerland
Email :info@astra.admin.ch
URL :https://www.simap.ch

Tender Details

Object of the contract
Architectural, construction, engineering and inspection services

Description: Contract notice: Architectural, construction, engineering and inspection services

Authority Type: Ministry or any other national or federal authority
Contact Nature: Services
Procedure: Open procedure
Document: Contract notice
Regulation: GPA
Award criteria: The most economic tender
CPV code: 71000000, 73000000, 71000000, 73000000
CPV Description: Architectural, construction, engineering and inspection services.

Research and development services and related consultancy services.

Mobility Pricing Wirkungsanalyse am Beispiel der Region Zug.

Ziel von Mobility Pricing (MP) ist, die Mobilitaetsnachfrage langfristig durch benuetzungsbezogene Abgaben zeitlich besser zu verteilen und so die Verkehrsinfrastruktur gleichmaessiger auszulasten. DemnaIn the future, traffic prices and charges on rail and road should be differentiated on a daily basis. The order includes:

Main Site: Ittigen, FEDRO.

The aim of Mobility Pricing (MP) is to spread the demand for mobility over time in the long term through usage-related levies and thus to utilize the transport infrastructure more equally. According to the traffic prices or taxes-Differentiated by rail and road on a daily basis. The assignment includes:

0 General Project Support,

1 Definition of Tariff Scenarios,

2 Development of Instruments,

3 Theoretical impact analysis using the Zug region,

4 Assessment of mobility pricing and comparison with alternatives using KNA,

5 Documentation with interim reports and Final Report,

6 Option: Refinement-of the tariff scenarios in the OeV and description of the traffic effect.

The following proofs of suitability / confirmations must be submitted together with the (specified) offer documents, otherwise the offer can not be considered: For EC1: Statement on the provision of comparable complexity and task in the Themes of Transport Economics, Vetrans-frontier modeling, impact analysis and cost-benefit analysis in traffic, each based on a reference project, with one reference project providing proof of several thematic areas.

On EK2 Confirmation of compliance with Swiss regulations on occupational safety and equal pay for men and women .

Proof of the supplier that he himself as well as that of ihthird parties (subcontractors and subcontractors) comply with the procedural principles in accordance with the self-declaration sheet of the BKB

Procurement Conference. Evidence is provided by means of a legally binding signing of the self-declaration sheet of the BKB procurement conference.

Link:

https: //www.beschaffung.admin.ch/dam/bpl/de/dokumente/Anbieter/Selbstdeklaration/Selbstdeklaration_allgemein.pdf.download.pdf / Selbstdeklaration_allgemein.pdf

Suppliers with more than 50 employees and their first-tier subcontractors with more than 50 employees each have to prove, in addition to the self-declaration sheet, how

the payroll practice has been checked. Evidence is provided by self-test (Logib, Link:

https: //www.ebg.admin.ch/ebg/de/home/dienstleistungen/selbsttest-tool--logib.html). Evidence may also be provided by inspections by public authorities or third-party wage analyzes.

This proof of eligibility must be submitted within 10 calendar days of the request

(after submission of the tender and before the award).

Regarding EC3: after the tender has been submitted and before the contract is awarded are to be submitted at the request of the client within 10 calendar days:

- extract from commercial register,

- Swiss extract from Swiss register or equivalent official document from foreign authorities,

not older than 3 months each.

Re. EK4: The project leader and stv. Project leaders secure German (project language) at least level B2 (written and oral) according to the common European reference framework (GeRS / CEFR). All project results andDocuments to be written in German.

Partial offers are not permitted.

Requirements for non-WTO member countries: None.

Business conditions: According to the contract of agreement provided for.

Negotiations: Reserved. Pure offer rounds resp. Price negotiations are not carried out. Within the framework of renegotiations, offer adjustments or services- Principles of the procedure: The Principal assigns public service contracts for services in Switzerland only to providers who guarantee compliance with the health and safety at work regulations and working conditions for women and men as well as equal pay for men and women information:-1. Reserved are the procurement maturity of the project as well as the availability of the credits. 2. The preparation of the offers will not be refunded. The offer documents will not be returned. 3. The opening of the offers is not public. 4. Exclusion, pre-employment: EPB Schweiz AG is excluded from participation in the present procurement procedure. Award criteria The AKey award criteria must be submitted together with the (pre-set) tender documents: ZK1: Experiences and competencies of the key persons (30%) ZK1.1: Professionals (14%) At least two professionals with their competences and experience cover the following topics: Traffic modeling (6%), b) Impact analyzes (4%) c) Cost-benefit analyzes in transport-(4%). The specialists mentioned may not be identical with the project manager. The provider describes the competencies and professional experience of the named experts in the corresponding topic based on a reference project and further information. ZK1.2: Project Leader (12%) a) Sound competences of the project leader in the management of complex and larger projects. The provider beschreibt is a reference project of the project manager, who has successfully completed it as a project manager and which is comparable to the project in terms of complexity and content requirements (transport economy). (6%) b) Professional experience as project leader (6%) The evaluation covers professional activities, competences and number of years. ZK1.3: Substitute (4%) a) Substantiatede Knowledge of deputy project manager in the management of complex and larger projects. The provider describes a reference project of the deputy project manager, who works as a project manager resp. Deputy. Project manager has successfully completed and which is comparable to the project in terms of complexity and content requirements. (2%b) Professional experience as project leader (2%) The evaluation covers professional activities, competences and number of years. ZK2: Appropriateness of the procedural concept: work steps, methods, instruments (24%) The procedural concept for the provision of the services is suitable / expedient and traceable and allows conclusions to be drawn on the results to be achieved efficiently. For the services 1 4 and the-Option, the vendors describe the procedure concept. It should be made clear in the description with which work steps and with which methods, possible data, means and instruments an answer to the questions can be brought about. In the offer the methods and instruments are to be described in detail. In the context of order fulfillment, only geringfuegige adjustments resulting from the discussion with the client. ZK2.1: Performance No. 1: Tariff scenarios (6%) ZK2.2: Performance No. 2: Instruments (6%) ZK2.3: Performance No. 3: Impact analysis (6%) ZK2.4: Performance No. 4 : Evaluation (6%) ZK 3: Price (20%) ZK4: Mandate of the contract and critical rating (16%) Reproduction and evaluation of the advertised contract (including option) from the SNot the offering company. Demolition over the expected ...


Internet address (URL): https://www.simap.ch
Directive: Classical Directive (2014/24/EU)

Documents

 Tender Notice