Procurement Summary
Country: France
Summary: Contract in Design and Execution Preparatory Work for Apm Perimeter: Pef Public Car Park - Ifu Building - Satellite S3 - Satellite S4
Deadline: 22 Jun 2026
Posting Date: 05 Jun 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 142699529
Document Ref. No.: 386346-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45000000 - Construction work
45330000 - Plumbing and sanitary works
45310000 - Electrical installation work
45210000 - Building construction work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Contract in design and execution Preparatory work for APM perimeter: PEF public car park - IFU building - Satellite S3 - Satellite S4 The purpose of this contract is to provide the following services: the diversions of the technical premises of the 3 PEF parking levels according to areas demarcated into zones central car park between lines 15 and 23 power supplies from the technical gallery on level -4 the replacement of the LV power supplies for baggage sorting located in the baggage gallery of the level -4 the improvements to the IFU building on the public side to widen circulation and therefore move the technical premises hindering the future right-of-way and to designate them in a safety zone, with resumption of the networks the development of zones S3 and S4 in sections optional The purpose of this contract "Preparatory work for the diversion of the technical premises at the PEF and IFU, as well as the release of the S3-S4 rights of way" is to divert a certain number of buildings or structures, impacted by this new metro line. automatic, and in particular the need for preparatory work in existing works: -The PEF car park and the IFU building for the creation of the new APM T2EK station -The S3 satellite for the creation of the new APM S3 ZR SUR station in installments optional 1 - The S4 satellite for the creation of the new APM S4 ZR SUR station in optional tranche 2 Note that the work at S3 and S4 is of low importance compared to the preparatory work at station T2E...
Document Type: Contract Notice Reference Number: SPA023409 Contract Type: works Authority Type: spec-rights-entity Doc Title: Contract in design and execution Preparatory work for APM perimeter: PEF public car park - IFU building - Satellite S3 - Satellite S4 Dispatch Date: 2026-06-04 Publish Date: 2026-06-05 Submission Date: 2026-06-22
Documents
Tender Notice