Procurement Summary
Country : Canada
Summary : Consultant - Installation of 2- Level 3 Ev Fast Chargers
Deadline : 14 Jul 2025
Other Information
Notice Type : Tender
TOT Ref.No.: 121725173
Document Ref. No. : GOC6692813-CS-HAM
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Design and Construction Administration services required to install two (2) - Level 3 EV Fast Chargers and all the electrical infrastructure needed to support this installation. The existing 3 level 2 EV chargers are to remain in place and operational. Design to include electrical meter(s) to monitor the electricity consumption of the EV Chargers. Consultant to analyze the existing electrical supply to the facility and determine if service upgrade is required. Design to include provisions for installation of additional level 3 EV chargers in the future.Design to meet the requirements set out in BGIS document E18EN - SOW Electric Vehicle Existing Feasibility Study Review, Design and Construction Administration.Design to meet the requirements of PSPC Technical Bulletin for fire protection and prevention for EV vehicles.Design to include interconnection of the EV Charger controls with the existing Building Automation System for control and monitoring of the EV Chargers. Please note that the BAS at the facility is in the process of being upgraded.Design to consider accessibility requirements, security requirements to manage vandalism and theft, optimal cable length, requirements for testing of the EV Chargers for conformance with specifications, and warranty requirements.The EV Chargers must be subscription free with no subscription services to use them. Consultant to include the specifications for the EV chargers.All work must be completed by December 17, 2027.
Solicitation Type : RFQ - Request for Quote (Formal)
Reference Number : 0000296998
Location : Canada, Ontario, ON - 35 - Toronto
Delivery Point : 2301 MIDLAND AVE, TORONTO, ON
Purchase Type : One Time Only- Delivery Date:Jul 31, 2025
Description : Design and Construction Administration services required to install two (2) - Level 3 EV Fast Chargers and all the electrical infrastructure needed to support this installation. The existing 3 level 2 EV chargers are to remain in place and operational. Design to include electrical meter(s) to monitor the electricity consumption of the EV Chargers. Consultant to analyze the existing electrical supply to the facility and determine if service upgrade is required. Design to include provisions for installation of additional level 3 EV chargers in the future.Design to meet the requirements set out in BGIS document E18EN - SOW Electric Vehicle Existing Feasibility Study Review, Design and Construction Administration.Design to meet the requirements of PSPC Technical Bulletin for fire protection and prevention for EV vehicles.Design to include interconnection of the EV Charger controls with the existing Building Automation System for control and monitoring of the EV Chargers. Please note that the BAS at the facility is in the process of being upgraded.Design to consider accessibility requirements, security requirements to manage vandalism and theft, optimal cable length, requirements for testing of the EV Chargers for ...
Documents
Tender Notice