Procurement Summary
Country: Poland
Summary: Construction Work as Part of "Modernization of the Civil Protection Resources Warehouse - Modernization of the Electrical Installation with Adaptation to an Independent Power Source" in the Design and Build Formula...
Deadline: 17 Aug 2026
Posting Date: 29 Jul 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 146123957
Document Ref. No.: 2026/BZP 00366061/01
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45000000 - Construction work
71200000 - Architectural and related services
71400000 - Urban planning and landscape architectural services
71300000 - Engineering services
71248000 - Supervision of project and documentation
71244000 - Calculation of costs, monitoring of costs
71242000 - Project and design preparation, estimation of costs
71220000 - Architectural design services
71000000 - Architectural, construction, engineering and inspection services
45421141 - Installation of partitioning
45421000 - Joinery work
45400000 - Building completion work
45310000 - Electrical installation work
45223500 - Reinforced-concrete structures
45111291 - Site-development work
45111200 - Site preparation and clearance work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
construction work as part of "Modernization of the Civil Protection Resources Warehouse - modernization of the electrical installation with adaptation to an independent power source" in the design and build formula... construction work as part of "Modernization of the Resource Warehouse Civil Protection, modernization of the electrical installation with adaptation to an independent power source in the design and build formula 1. The subject of the order is the performance of construction works as part of the task Modernization of the Civil Protection Resources Warehouse modernization of the electrical installation with adaptation to an independent power source in the design and build formula.2. The subject of the order includes: 1) obtaining the necessary maps for design purposes; 2) preparing a construction design for the entire scope described works together with the author's supervision;3) obtaining a building permit or submitting the appropriate notification in accordance with the applicable provisions of the Construction Law (if required)4) preparing a technical specification for the execution and acceptance of the works construction for the entire scope of design works.5) preparation of a cost estimate based on the bill of quantities covering the entire scope of works covered by the construction design.6) performance of construction works consisting in modernization of the electrical installation of the existing facility along with equipping with an individual power source in the form of a power generator and separating individual sections of the warehouse using building partitions.7) obtaining and providing the Ordering Party with the necessary documentation regarding the receipt of the subject of the order.3. ...
Documents
Tender Notice