Construction of the Wastewater Treatment Plant, Wastewater Collection System and... Tender

MUNICIPALITY OF KOLAŠIN has floated a tender for Construction of the Wastewater Treatment Plant, Wastewater Collection System and Implementation of Water Supply Priority Measures in the Municipality of Kolašin. The project location is Montenegro and the tender is closing on 09 Oct 2025. The tender notice number is 525563-2025, while the TOT Ref Number is 124273419. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country: Montenegro

Summary: Construction of the Wastewater Treatment Plant, Wastewater Collection System and Implementation of Water Supply Priority Measures in the Municipality of Kolašin

Deadline: 09 Oct 2025

Other Information

Notice Type: Tender

TOT Ref.No.: 124273419

Document Ref. No.: 525563-2025

Financier: Self Financed

Purchaser Ownership: Public

Tender Value: Refer Document

Purchaser's Detail

Name: Login to see tender_details

Address: Login to see tender_details

Email: Login to see tender_details

Login to see details

Tender Details

The indicative scope of works covers the following elements: 1. Sewerage network: Construction of sewerage network in the approximate length of 9.2 km which will serve to 3000 inhabitants in the following settlements: Kolašin city centre, Braće Vujisić (Dulovina), Breza and partly Smailagića Polje and Gornji Pažanj. 2. Water supply priority measures: Water supply priority measures include services, supplies and construction works to be designed, supplied, installed and constructed by the Contractor. - Preparatory services (operational GIS, HID based hydraulic model, leakage detection for 30 km of network and detailed design of new elements including SCADA) - Supply, installation and commissioning of bulk flowmeters, and water meters (400), establishment of DMAs and SCADA - Works for upgrade of the water distribution system hydraulic configuration. 3. Wastewater Treatment Plant Design and Construction of WWTP in Bakovići settlement - Conventional Activated Sludge Process and aerobic sludge stabilization. Design and construction of the WWTP shall include two phases: Phase I - 4000 PE (to be constructed): Wastewater flowrate (including infiltration) = 765 m³/d (9 l/s); Peak dry weather flow = 57 m³/h (16 l/s); Peak wet weather flow to =109 m³/h. Phase II - additional 2000 PE (to be considered in design): Wastewater flowrate (including infiltration= 1045 m³/d (12 l/s); Peak dry weather flow = 77 m³/h (21 l/s); Peak wet weather flow = 150 m³/h The proposed process for WWTP...
Document Type: Contract Notice
Contract Type: works
Authority Type: la
Doc Title: Construction of the wastewater treatment plant, wastewater collection system and implementation of water supply priority measures in the Municipality of Kolašin
Dispatch Date: 2025-08-07
Publish Date: 2025-08-11
Submission Date: 2025-10-09

Documents

 Tender Notice


Procurement Documents for Montenegro

Access a comprehensive library of standard procurement documents specific to Montenegro. Here, you'll find all the essential forms, guidelines, and templates required for tender applications and submissions in Montenegro

Explore Procurement Documents for Montenegro


Want To Bid in This Tender?

Get Local Agent Support in Montenegro and 60 More Countries.

View All The Services


View Tenders By


Publish Tenders


Have Any Dispute With The Purchaser?