Procurement Summary
Country: Poland
Summary: Construction of Warehouse Garages and Development of Design Documentation in the "Design and Build" Formula
Deadline: 07 Aug 2026
Posting Date: 23 Jul 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 145743919
Document Ref. No.: 2026/BZP 00356352/01
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45223800 - Assembly and erection of prefabricated structures
45210000 - Building construction work
45111200 - Site preparation and clearance work
45233222 - Paving and asphalting works
45311200 - Electrical fitting work
71220000 - Architectural design services
71320000 - Engineering design services
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
The scope of the order includes in particular: a) development of design documentation as part of the Functional and Utility Program (hereinafter referred to as FFU), along with obtaining the necessary decisions and arrangements for the implementation of the investment task, b) execution of construction and assembly works and installation works together with the necessary accompanying infrastructure based on the design documentation prepared by the Contractor along with services that are not construction works, c) exercising author's supervision over the developed design documentation at the stage construction works being carried out. The detailed scope of works is presented in the Functional and Utility Program (FFU). The scope of the task includes: Ad. a) comprehensive development of multi-disciplinary design documentation in order to submit works or obtain a decision about building permit. The project must cover the construction and electrical industries. The Contractor will obtain, on behalf of the Ordering Party, a final decision on the permit to use the facility or make an effective notification of the completion of the works (obtain no objections). authority).The design documentation should be internally consistent and correlated in all industries, and contain optimal solutions...
Documents
Tender Notice