Procurement Summary
Country: Canada
Summary: Construction Services for the Trenchless Rehabilitation and Replacement of Mainline Sanitary, Storm and Culverts in the Regional Municipality of Peel, Contract No. 1 Project 23-2300K
Deadline: 08 Apr 2026
Posting Date: 18 Mar 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 138006148
Document Ref. No.: 2026-142T
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
This Contract encompasses the trenchless rehabilitation of sanitary sewers, storm sewers, and culverts utilizing cured-in-place and fold-and-form pipelining technologies. The scope of work also includes external point repair and partial/full-length replacement at various locations within the Regional Municipality of Peel. Scope items involve trenchless rehabilitation and replacement of existing sanitary sewers, storm sewers, and culverts, which include:
Full-length structural rehabilitation of approximately 2300 linear meters of sanitary sewers in sizes from 250mm to 375mm diameter.Full-length structural rehabilitation of approximately 2350 linear meters of storm sewers and culverts in sizes from 200mm to 1050mm diameter. Full-length structural rehabilitation of approximately 17 linear meters of non-circular storm sewer in size 850x1325mm diameter Partial and Full-length replacement of approximately 95m linear meters of storm and culverts in sizes from 300mm to 600mm diameter.Installation, reinstatement, and modification of maintenance holes and Catch basin, including all necessary appurtenances. The Work shall include, but is not limited to, the provision of all necessary labour, materials, and services required to perform rehabilitation, repair, and associated open-cut operations. This includes saw cutting and removal of asphalt pavement, concrete sidewalks, curbs and gutters, and vegetated surfaces; excavation and disposal off site of excess materials, including rock and construction surplus material. All excavation work shall include shoring; dewatering; protection of above-ground and underground structures and utilities; backfilling and compaction; placement and jointing of asphalt; traffic control; and site restoration to existing or improved conditions.
PREQUALIFIED GENERAL CONTRACTORS AND SUB-CONTRACTORS
The following General Contractors have been prequalified for this Project in accordance with prequalification document 2025-102PQ:
Aqua Tech Sol...
Show Categories : Water and Sewer, Flow Testing, Hydrant Painting, Wastewater Treatment & Services, Water Treatment Chemicals Supplies & Services, Well & Water Related Services, Watermain Swabbing, Cathodic Protection, Hydrant Inspections, Emergency Watermain, CCTV Inspection, New or Replacement Water/Sewer Lines, Water Meters, Catch Basin Cleaning
More Details
Bid Classification: Construction
Documents
Tender Notice