Procurement Summary
Country: Poland
Summary: Construction of a Resource Warehouse at Ul. Stawowa 8 in Opole as Infrastructure Necessary to Implement Population Protection and Civil Defense
Deadline: 11 Aug 2026
Posting Date: 28 Jul 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 146040654
Document Ref. No.: 2026/BZP 00363821/01
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45000000 - Construction work
45216000 - Construction work for buildings relating to law and order or emergency services and for military buildings
45332000 - Plumbing and drain-laying work
45113000 - Siteworks
45232000 - Ancillary works for pipelines and cables
45310000 - Electrical installation work
45315600 - Low-voltage installation work
45317000 - Other electrical installation work
71000000 - Architectural, construction, engineering and inspection services
71220000 - Architectural design services
45110000 - Building demolition and wrecking work and earthmoving work
45111200 - Site preparation and clearance work
45262300 - Concrete work
45262310 - Reinforced-concrete work
45320000 - Insulation work
45262410 - Structural steel erection work for buildings
45261210 - Roof-covering work
45421160 - Ironmongery work
45442100 - Painting work
45321000 - Thermal insulation work
45262100 - Scaffolding work
45300000 - Building installation work
45331210 - Ventilation installation work
45231300 - Construction work for water and sewage pipelines
45311000 - Electrical wiring and fitting work
45311200 - Electrical fitting work
45312200 - Burglar-alarm system installation work
45314300 - Installation of cable infrastructure
45316100 - Installation of outdoor illumination equipment
45233200 - Various surface works
45233226 - Access road construction work
45111291 - Site-development work
45312100 - Fire-alarm system installation work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
The subject of the order is the construction of a new facility - a resource warehouse with storage sheds at ul. Stawowa 8 in Opole, which will be implemented in the design and build formula. Part of the order is the development of design documentation for the construction of a resource warehouse with shelters for storing flood protection equipment and equipment for responding to various threats. Design work should be carried out based on the Functional and Utility Program constituting an annex to the SWZ.
Documents
Tender Notice