Procurement Summary
Country: Poland
Summary: Construction of Renewable Energy Infrastructure for the Development of the Brama Podhala Energy Cluster - a Demonstration Project of a Hydrogen Energy Storage Facility
Deadline: 30 Oct 2026
Posting Date: 23 Oct 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 151347209
Document Ref. No.: 735900-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
31430000 - Electric accumulators
09332000 - Solar installation
09331200 - Solar photovoltaic modules
42123100 - Gas compressors
44211100 - Modular and portable buildings
44615000 - Pressure vessels
45310000 - Electrical installation work
45315100 - Electrical engineering installation works
45315300 - Electricity supply installations
45333000 - Gas-fitting installation work
71323100 - Electrical power systems design services
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Construction of renewable energy infrastructure for the development of the Brama Podhala Energy Cluster - a demonstration project of a hydrogen energy storage facility
The subject of the order is the design, delivery, assembly and commissioning of a hydrogen installation for storing energy from renewable energy sources together with a photovoltaic installation for generating energy energy.
1. The subject of the order is the design, delivery, assembly and commissioning of a hydrogen installation for storing energy from renewable energy sources together with a photovoltaic installation for energy generation, hereinafter referred to as "Installation.
2. The subject of the order is design, delivery, assembly, integration and commissioning demonstration energy storage facility using hydrogen technology as part of the system. The purpose of the installation is to produce hydrogen from electricity, store it and later convert the stored energy into electricity, enabling demonstration and operation system in real conditions. The installation is to be mobile, consisting of a generation module and a hydrogen storage module.
Doc Title: Construction of renewable energy infrastructure for the development of the Brama Podhala Energy Cluster - a demonstration project of a hydrogen energy storage facility
Contract Type: supplies
Document Type: Contract Notice
Reference Number: WOM.271.38.2026
Contract Type: supplies
Authority Type: body-pl
Doc Title: Construction of renewable energy infrastructure for the development of the Brama Podhala Energy Cluster - a demonstration project of a hydrogen energy storage facility
Dispatch Date: 2026-10-21
Publish Date: 2026-10-23
Submission Date: 2026-10-30
Documents
Tender Notice