Procurement Summary
Country: Poland
Summary: "Construction of a Recreational Path with Construction Equipment in Frampol and Construction of a Rope Park with Small Architectural Objects"
Deadline: 30 Jul 2026
Posting Date: 16 Jul 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 145264176
Document Ref. No.: 2026/BZP 00343543/01
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45100000 - Site preparation work
45111200 - Site preparation and clearance work
45262300 - Concrete work
45233200 - Various surface works
45223820 - Prefabricated units and components
45310000 - Electrical installation work
45311100 - Electrical wiring work
45314310 - Installation of cable laying
45316100 - Installation of outdoor illumination equipment
35125300 - Security cameras
45112100 - Trench-digging work
77211000 - Services incidental to logging
43325000 - Park and playground equipment
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
part 1 of the order Construction of a recreational path with construction equipment in the town of Frampol. The scope of work includes, among others: - construction of a pedestrian and bicycle path; - construction of an electrical installation with lighting devices; - construction of a telecommunications installation with monitoring devices;- installation of educational boards;- installation of benches and garbage bins along the path;- installation of park swings along the reservoir;- installation of a bicycle rack;- installation of a visitor counter.4.3. The contractor is obliged to perform construction works in accordance with from the principles of DNSH. Due to the fact that the Contractor's remuneration indicated in the offer will be a lump sum, when pricing the offer, the Contractor should rely on the scope indicated in the design documentation referred to in points 1) and/or 2) and STWIOR. Bill of quantities robt is auxiliary. The occurrence, during the execution of the contract, of works not included in the bill of quantities or works in a larger quantity than that assumed in the bill of quantities will not entitle the Contractor to demand additional remuneration - if these works were included in the bill of quantities. design documentation referred to in points 1) and/or 2) and STWIORB.
Documents
Tender Notice