Procurement Summary
Country : Dominican Republic
Summary : Construction Project of the Complementary Irrigation and Water Supply Works of the Montegrande Dam
Deadline : 10 Nov 2023
Other Information
Notice Type : Tender
TOT Ref.No.: 90954860
Document Ref. No. : LPI-BCIE-INDRHI-0001-2023
Financier : Other Funding Agencies
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Prequalifications are invited for Construction Project of the Complementary Irrigation and Water Supply Works of the Montegrande Dam in the Provinces of Barahona, Independencia and Bahoruco, Dominican Republic.
Lot 1- Complementary Works of the Montegrande Dam: Mixed conduction line,
conduction for irrigation and gravity water supply to the southwest and central aqueduct
hydroelectric.
Lot 2- Complementary Works of the Montegrande Dam: Dam Rehabilitation Works
Santana and Left Bank irrigation works.
Lot 3- Complementary Works of the Montegrande Dam: Works to mitigate damage due to
flood effect.
The National Institute of Hydraulic Resources (INDRHI) is responsible for this process of
prequalification and intends to prequalify contractors for three divided lots of the
Following way:
Lot 1- Complementary works of the Montegrande Dam: Mixed conduction line, Line
conduction for irrigation and gravity water supply to the southwest aqueduct and
Hydroelectric power station.
This lot includes the execution of the following works:
- Right Bank Irrigation Works
Pipe length
47.8 km Total length of the main pipeline
43.3 km Total length of secondary pipelines
140 km Total length of tertiary pipelines
Pipe diameter: 0.3...3.2 m
Irrigation area: 7, 551 hectares.
- Works for Water Supply
Pipe length: 11.3 km
Pipe diameter: 2.2 m
- Hydroelectric Generation Plant and Transmission Works
13.3 MW maximum output power
69 kV nominal transmission line voltage
7.6 km Transmission line length
Lot 2- Complementary works of the Montegrande Dam: Dam Rehabilitation Works
Santana and Left Bank irrigation works
This lot includes the execution of the following works:
- Rehabilitation of the Santana Dam
- Left Bank irrigation scheme
Pipe length
ExTERNAL CONFIDENTIAL
22.2 km Total length of the main pipeline
55.7 km Total length of secondary pipelines
200 km Total length of tertiary pipelines
Pipe diameter: 0.3...3.5 m
Irrigation area: 5, 440 hectares
Lot 3- Complementary works for the Montegrande Dam: Works to mitigate damage
due to flooding
This lot includes the construction of embankments with the following characteristics:
23 km Total length of the embankments
2.5 - 5.5 m Height of embankments
4-5 m Crowning width
The Tender is expected to be carried out in December 2023
Contractors may submit their request for prequalification either individually or as
member of a joint venture.
2.3 Prequalification will be carried out in accordance with the procedures of the Central American Bank of
Economic Integration established in the Policy for the Obtaining of Goods, Works, Services and
Consulting with CABEI Resources and its Standards for Application found in the following
Internet site: https://www.bcie.org.
The National Institute of Hydraulic Resources (INDRHI) is responsible for this process of
prequalification and intends to prequalify contractors for three divided lots of the
Following way:
Lot 1- Complementary works of the Montegrande Dam: Mixed conduction line, Line
conduction for irrigation and gravity water supply to the southwest aqueduct and
Hydroelectric power station.
This lot includes the execution of the following works:
- Right Bank Irrigation Works
Pipe length
47.8 km Total length of the main pipeline
43.3 km Total length of secondary pipelines
140 km Total length of tertiary pipelines
Pipe diameter: 0.3...3.2 m
Irrigation area: 7, 551 hectares.
- Works for Water Supply
Pipe length: 11.3 km
Pipe diameter: 2.2 m
- Hydroelectric Generation Plant and Transmission Works
13.3 MW maximum output power
69 kV nominal transmission line voltage
7.6 km Transmission line length
Lot 2- Complementary works of the Montegrande Dam: Dam Rehabilitation Works
Santana and Left Bank irrigation works
This lot includes the execution of the following works:
- Rehabilitation of the Santana Dam
- Left Bank irrigation scheme
Pipe length
ExTERNAL CONFIDENTIAL
22.2 km Total length of the main pipeline
55.7 km Total length of secondary pipelines
200 km Total length of tertiary pipelines
Pipe diameter: 0.3...3.5 m
Irrigation area: 5, 440 hectares
Lot 3- Complementary works for the Montegrande Dam: Works to mitigate damage
due to flooding
This lot includes the construction of embankments with the following characteristics:
23 km Total length of the embankments
2.5 - 5.5 m Height of embankments
4-5 m Crowning width
The Tender is expected to be carried out in December 2023
Contractors may submit their request for prequalification either individually or as
member of a joint venture.
[Disclaimer: The above text is machine translated. For accurate information kindly refer the original document.]
Documents
Tender Notice