Procurement Summary
Country: Slovakia
Summary: Construction of a Photovoltaic Power Source with Battery Storage Description: the Subject of the Contract is the Construction of a Photovoltaic Power Source (Hereinafter Referred to as "Pve") with Battery Storage...
Deadline: 15 Apr 2026
Posting Date: 15 Apr 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 139531104
Document Ref. No.: 5243 - VST
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: EUR 1317
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Construction of a photovoltaic source of electrical energy with battery storage Description: The subject of the order is the construction of a photovoltaic source of electrical energy (hereinafter referred to as "PVE") with battery storage in the EU Student House in Bratislava Dolnozemska cesta 1, Bratislava Petrzalka. The PV source will supply the entire building of the student dormitory with the produced electricity, store the energy and excess in the battery storage and will not deliver the produced power to the LV distribution network. The total output of the proposed PV plant is 80kW. PV panels are proposed to be installed on a free-standing metal structure on the flat roof of the student dormitory. With this solution, the stress covering and thermal insulation of the roof itself will not be burdened, and the roof surface will be permanently accessible for possible service. Protection against with lightning, a new one is built with connection to the already built conduits and grounding device. All parts of the FVE will be protected by arresting rods in a protective angle and by the rolling ball principle. Some transverse lines are modified and replaced with insulated ones so that the condition is met a sufficient distance with Internal lightning protection will be supplemented with surge arresters and protective bonding. Furthermore, a unified system of optimization of electricity production will be built with a safety system shutdown of each PV panel, including control parts with control data connection to the control system and EPS. I will build vertical cable lines of footboards 1PP-10NP including the construction part, other cable routes, addition of the main electrical switchboard RH1, RK, charging station with accessories including the construction part. The space of the technical room will be completely renovated and all the proposed technical equipment will be installed. The safety shutdown of the PV plant will be connected to the existing EPS. A superi...
Predpokladaná hodnota : "Open Sans", sans-serif; font-size: 13px; line-height: 17px; } ul.notice-list li::before { content: unset !important; color: transparent; display: inline-block; width: unset; } ul.notice-list { list-style: none; margin-top: unset; margin-bottom: unset; padding-bottom: 10px; padding-left: 15px; } .list-title { margin-bottom: unset; border: none; font-size: 14px; color: #6495d5; font-weight: bold; padding-left: 0; padding-top: 12px; } .list-sub-title { color: black; font-weight: bold; padding-top: 12px; } /*#output-container ul:first-of-type { padding-bottom: 50px; }*/ .title { margin-bottom: 5px; } .id { padding-bottom: 30px; } #output-container { padding-bottom: 30px; } Notification of the result of the public procurement Identifier of the ÚVO: 13972131. Basic data Organization: University of Economics in Bratislava (ID: 88898)
Documents
Tender Notice