Procurement Summary
Country: United Kingdom
Summary: Construction of a New Laboratory Building (Holt 2 Lab), Designed and Built to Operate at Containment Level 3 (Cl3) Standards
Deadline: 06 May 2026
Posting Date: 09 Apr 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 139226952
Document Ref. No.: CR2025/26/123
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45214610 - Laboratory building construction work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
SCOPE OF WORKS: Construction of a new laboratory building designed and built to operate at Containment Level 3 (CL3), on a greenfield site within the existing boundary of Forest Research's Alice Holt Research Station in Farnham, Surrey, UK. The new 'Holt 2' research facility will be a purpose-built expansion of existing facilities at Forest Research's Alice Holt Research Station, designed to significantly enhance the UK's capability and capacity to study tree pests and pathogens in controlled environments. The new facility will significantly increase the capacity of the existing Holt 1 containment laboratory. Full specifications will be provided in the Specification Documents once the Invitation to Tender is released. The project overview document is attached to this notice. CONTRACT STRATEGY: Traditional construction works, turnkey contract (Client-supplied detailed design & specification) on a fixed lump sum basis using the NEC4 ECC Main Option A - Priced contract with Activity Schedule. Performance Bond (10%), and Parent Company Guarantees (where applicable). Liquidated damages for delay are anticipated to be set at £700 per day, subject to confirmation in the ITT. DESIGN STRATEGY: At the time of issuing the ITT, detailed design and specification for all elements (RIBA Stage 4) will have been completed (and included in the ITT); the appointed turnkey contractor will take responsibility from, and progress from, the start of RIBA Stage 5 onwards. It is anticipated that the I...
Documents
Tender Notice