Procurement Summary
Country: Poland
Summary: Construction of the Municipal Road Ul. Sunflowers in nowe Bielice
Deadline: 30 Mar 2026
Posting Date: 14 Mar 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 137797062
Document Ref. No.: 2026/BZP 00154272/01
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45233120 - Road construction works
45220000 - Engineering works and construction works
45222000 - Construction work for engineering works except bridges, tunnels, shafts and subways
45230000 - Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
45233200 - Various surface works
45100000 - Site preparation work
45111200 - Site preparation and clearance work
45112000 - Excavating and earthmoving work
45112210 - Topsoil-stripping work
45111300 - Dismantling works
45113000 - Siteworks
45111291 - Site-development work
45112700 - Landscaping work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
1) The subject of the order is the performance of construction works as part of the task titled: Construction of the municipal road ul. Sunflowers in Nowe Bielice.2) Subject of the orderThe subject of the order is the implementation of construction works consisting in the reconstruction of a road municipal street Sunflowers in the town of Nowe Bielice, Biesiekierz commune, Koszalin district, West Pomeranian Voivodeship. The investment includes road works aimed at improving road traffic conditions and the safety of road users, including residents of adjacent properties. The project envisages the construction of a road with a concrete surface (made of jomb slabs with dimensions of 100x75x12.5 mm) in a two-row system with a spacing between the rows of 1 m. Filling the space between the layers with a mixture of aggregates. Wide roads between the extreme questions is 3.0 m. There are 4 passing loops along the entire section. Each passing area is 25 m long (without slopes), exit and entry slopes are 1:2, and the width of the road within the passing areas is 5.0 m. Construction of the road and exits: - surface made of slabs jomb 12.5 cm;- sand bedding thick. 5 cm;- top layer of aggregate foundation 0-31.5 mm 20 cm;- bottom layer of foundation...
Documents
Tender Notice