Procurement Summary
Country : Poland
Summary : Construction of the Mierzyn Beltway Along Dk 10 (Delivery - Szczecin)
Deadline : 24 Jul 2025
Other Information
Notice Type : Tender
TOT Ref.No.: 122338767
Document Ref. No. : 445835-2025
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
The subject of the contract is:
Construction of the Mierzyn beltway along DK 10 (Delivery - Szczecin)
The task includes the implementation of episodes:
1) Episode 1: Construction of the Mierzyn beltway along DK 10 in the area of GDDKiA properties, i.e. from 0+122 km to 1+380 km, from 2+520 km to 2+610 km, from km 3+490 to km 4+640, hereinafter referred to as "Episode 1"
2) section 2: Construction of the Mierzyn beltway along DK 10 in the area managed by the City of Szczecin, i.e. from 1+380 km to 2+520 km, from 2+610 km to 3+490 km, from 4+640 km to 4+770 km, hereinafter referred to as "section 2".
The scope of the task includes in particular:
- Road works: Class road construction GP with a cross -section of 2x2 on a section of the designed node, it is depressed along the S6 road to the existing national road in the area of the street Ku Ku Słońc (Ster Shopping Center area), reconstruction of cross roads and construction of service roads, construction and reconstruction of infrastructure for pedestrians and cyclists, construction and reconstruction Infrastructure for public transport, construction and reconstruction of congresses.
- Engineering facilities: construction of an object along the poviat road (above the beltway), construction of culverts and animals.
- lighting: construction of lighting the main route in the building area, construction of intersection lighting and transverse roads, construction of dedicated lighting for pedestrian crossings.
- rainwater sewage system with purifying devices: construction of a road drainage system in the form of rainwater drainage, retention tanks, trapezoidal ditches, construction of inlet wells collecting water from ...
Document Type: Contract Notice
Reference number: scan-3.2410.4.2025
Contract Type: Works
Authority Type: CGA
DOC TITLE: Construction of the Mierzyn beltway along DK 10 (Delivery - Szczecin)
Dispatch Date: 2025-07-08
Publish Date: 2025-07-09
Submission date: 2025-07-24
Documents
Tender Notice