Procurement Summary
Country: USA
Summary: Construction Management at Risk (Cmar) Terminal Restroom Modernization and other Improvements Project
Deadline: 20 May 2026
Posting Date: 18 Apr 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 139765820
Document Ref. No.: 2026-RFP-080
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
The Authority seeks qualified firms (Proposers) to provide on-call design collaboration, design assist, preconstruction, and construction services as a Construction Manager at Risk (CMAR) for the Terminal Restroom Modernization and Other Improvement Projects (“Program”) at the Ontario International Airport (ONT).The Program includes both federally funded/eligible projects and non-federally funded/ineligible projects as specified in the Table 1‑1.Table 1‑1 - Program FundingProject NameFundingTerminal Restroom Modernization ProjectFederally Funded /EligibleTerminal Hold-Room Enhancement ProjectNon-Federal / IneligibleOther ProjectsNon-Federal /IneligibleThe “Program” includes the following projects:Restroom Modernization ProjectReplace and upgrade aging facilities and equipment in the central public airside restrooms in Terminals 2 and 4 at ONT. Existing disabled access (ADA) stalls will be widened to comply with current ADA standards. Existing lighting, toilets, fixtures, and equipment will be removed and replaced with new energy-efficient LED lighting, water-efficient flush toilets, fixtures, and other equipment. The improvements will not change the existing number of stalls and fixtures in the restrooms. Prior to construction, temporary restrooms are to be constructed with approximately the same number of fixtures to ensure that the passenger level of service is maintained during construction. Hold-room Enhancements ProjectModernize hold rooms in Terminals 2 and 4 at ONT. The existing seating will be removed and replaced with new seating, new gate podiums, modernized gate electrical and data infrastructure, new carpet, and new overhead lighting. The hold room seating and podium arrangements will be reorganized to improve passenger flow and line of sight to gates. New seats will be equipped with power outlets to improve passenger experience and level of service. Seating power will be plugged into new floor outlet infrastructure.Other Projects OIAA has identified the...
Documents
Tender Notice