Procurement Summary
Country: Poland
Summary: Construction of a High-Parameter Heating Network with a Network Water Pumping Station for the Supply of Heat from the Waste Thermal Conversion Installation in Opole at Ul. Suburban Connection to the Heating Network...
Deadline: 05 May 2026
Posting Date: 25 Mar 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 138417673
Document Ref. No.: 204151-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45230000 - Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
71221000 - Architectural services for buildings
71320000 - Engineering design services
71322200 - Pipeline-design services
45000000 - Construction work
45200000 - Works for complete or part construction and civil engineering work
45220000 - Engineering works and construction works
45232140 - District-heating mains construction work
45111200 - Site preparation and clearance work
45232151 - Water-main refurbishment construction work
09323000 - District heating
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Construction of a high-parameter heating network with a network water pumping station for the supply of heat from the Waste Thermal Conversion Installation in Opole at ul. Suburban connection to the heating network... The subject of this order is design and execution of construction works for the investment entitled: "Construction of a high-parameter heating network with a network water pumping station, for the supply of heat from the Thermal Waste Conversion Installation in Opole at Podmiejska Street to the heating network "ECO S.A." The scope of the order also includes the design and construction of an electricity connection to the pumping station building. Additionally, the Contractor is obliged to obtain the right of disposal as part of the implementation of the entire subject of the order real estate for construction purposes, along with obtaining consent to regulate the legal status of heating infrastructure. The Contractor provides a guarantee and warranty for defects on the completed subject of the order for a period of 5 years from the date of signing the Final Protocol. acceptance of construction works. A detailed description of the subject of the contract is presented in Part III of the SWZ, and also results from the PPU (Part II of the SWZ). The subject of this order is the design and execution of construction works for the investment entitled: "Construction high-parameter heating network with a network water pumping station, for the supply of heat from the Waste Thermal Transformation Installation in Opole at ul. Suburban to the ECO S.A. heating network. The scope of the contract also includes design and construction of an electricity connection to the pumping station building. Additionally, as part of the implementation of the entire subject of the order, the Contractor will see...
Document Type: Contract Notice Reference Number: 26.2026 Contract Type: works Doc Title: Construction of a high-parameter heating network with a network water pumping station for the supply of heat from the Waste Thermal Conversion Installation in Opole at ul. Suburban to the ECO S.A. heating network. Dispatch Date: 2026-03-24 Publish Date: 2026-03-25 Submission Date: 2026-05-05
Documents
Tender Notice