Procurement Summary
Country: Canada
Summary: Construction of Flood Mitigation Works Along Bessette Creek for Two Work Packages.
Deadline: 26 Jun 2026
Posting Date: 18 Jun 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 143512566
Document Ref. No.: 230786
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
The Work includes construction of flood mitigation works along Bessette Creek for the following Work Packages: Work Package No. 1 (Quesnel to Maple St. Dike): Construction of approximately 500 m of AZ19-700 steel sheet pile dike from Quesnel Road to Maple Street along the right bank of Bessette Creek, including excavation, utility protection, vibration and settlement monitoring, environmental mitigation measures, steel capping installation, tie-ins, and associated property restoration works as required. Work Package No. 2 (WWT Lagoons Bank Protection): Construction of approximately 160 m of Class 50 kg riprap bank protection and live-staking along the left bank of Bessette Creek adjacent to the Village-s Wastewater Treatment Facility Lagoons, including erosion and sediment control measures, stream isolation and water management, subgrade shaping, environmental protection measures, riprap placement and associated restoration works.
Solicitation Type : RFT - Request for Tender (Formal) Reference Number : 00005088385 Location : British Columbia Purchase Type : Not Stated Dates Publication : 2026/06/17 07:28:00 AM EDT Closing Date : 2026/06/26 05:00:00 PM EDT Contact Information : Village of Lumby : [email protected] : Description : The Work includes construction of flood mitigation works along Bessette Creek for the following Work Packages: Work Package No. 1 (Quesnel to Maple St. Dike): Construction of approximately 500 m of AZ19-700 steel sheet pile dike from Quesnel Road to Maple Street along the right bank of Bessette Creek, including excavation, utility protection, vibration and settlement monitoring, environmental mitigation measures, steel capping installation, tie-ins, and associated property restoration works as required. Work Package No. 2 (WWT Lagoons Bank Protection): Construction of approximately 160 m of Class 50 kg riprap bank protection and live-staking along the left bank of Bessette Creek adjacent to the Village’s Wastewater Treatment Facility Lagoons, including erosion and sediment control measures, stream isolation and water management, subgrade shaping, environmental protection measures, riprap placement and associated restoration works.
Documents
Tender Notice