Procurement Summary
Country: Poland
Summary: Construction of a Fire Tank with a Part of the Fire Road and Delivery, Installation, Acceptance and Commissioning of Electrical Installations as Part of the Task "Adaptation of an Existing Building...
Deadline: 04 Aug 2026
Posting Date: 18 Jul 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 145401798
Document Ref. No.: 2026/BZP 00349911/01
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45000000 - Construction work
45220000 - Engineering works and construction works
45111220 - Scrub-removal work
45111230 - Ground-stabilisation work
45233220 - Surface work for roads
45310000 - Electrical installation work
45315100 - Electrical engineering installation works
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
1. The subject of the order is: Construction of a fire protection tank together with a part of the fire protection road and supplies, installation, acceptance and commissioning of electrical installations as part of the task "Adaptation of the existing building of the Social Welfare Home to the current applicable regulations and technical knowledge in terms of fire protection - stage I2. The subject of the order is the construction of a fire protection tank together with a part of the fire protection road as well as the supply, installation, acceptance and commissioning of electrical installations in Social Welfare Home in Kdzierzyn-Kol. 3. The scope of works related to the implementation of the task includes, among others: 1) ENGINEERING AND CONSTRUCTION WORKS AND ASSOCIATED WORKS. The scope of the task includes changing the communication system - locating the entrance from west side, i.e. ul. Zielna. b. From the entrance, a fire road should be constructed in the form of a new hardening, 5 and 4 m wide, adapted to the traffic of vehicles with a pressure of I00 kN/o, with a separate water drawing station. c. the fire route provides access to 36% of the perimeter building facade.d. All exits from the Social Welfare Home building have paved access to a fire road with...
Documents
Tender Notice