Procurement Summary
Country: Hungary
Summary: Construction of an Energy Center and Utility Network
Deadline: 28 Apr 2026
Posting Date: 25 Mar 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 138424364
Document Ref. No.: 205148-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45000000 - Construction work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
The main goal of the planned construction transformation is the establishment of the energy center supplying the Diósgyőr Castle, as well as the implementation of the civil engineering system, which is to be routed through the route of the bridge structure at the west, main entrance of the Castle, for water, high and low current, as well as the heating it ensures the connection of energy supply (local district heating), rainfall, sewage and fire water to the public utility network. The plan partially retains the existing group of visitor toilets in the annex of the Déryné House, but the rest of the house - affected by conversion - in part, only the functions and operating rooms assigned to the energy center will be created: basement boiler house, ground floor measuring, distribution and switching rooms, mechanical unit. The open-air demarcated industrial yard to be created next to the building will include heat pump, aggregator and gas receiving elements. Between the Energy Center and the west bridgehead of the Castle, underground cables and underground construction lines will be placed, according to a separate section of the plan. Plot area: 2158 m2 Built-up floor area: 298 m2 Current and planned built-up area: 14 % Current green area 41 % Floor areas of existing buildings: I. Cashier - booth: 3.6 m2 II. Déryné house - basement: 18 m2 - living room: 196 m2 - attic: 170 m2 (total: 384 m2) III. Annex building - basement: 35.37 m2 - floor space: 73.36 m2 - attic space: 57.75 m2 (total: 166.5 m2) About building structures (existing to be kept - planned new fence and machine foundation) Foundation: rammed concrete and laid stone slab; vb. plate and concrete bar base Masonry: durable...
Document Type: Contract Notice Reference Number: EKR002503602025 Contract Type: works Authority Type: la Doc Title: Construction of an energy center and utility network Dispatch Date: 2026-03-24 Publish Date: 2026-03-25 Submission Date: 2026-04-28
Documents
Tender Notice