Procurement Summary
Country: Czech Republic
Summary: Construction, Delivery and Commissioning of the K2 Biomass Boiler
Deadline: 25 Sep 2026
Posting Date: 18 Aug 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 147426545
Document Ref. No.:
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: CZK 17500000.00
CPV Classification
45251220 - Cogeneration plant construction work
44621200 - Boilers
42162000 - Steam-generating boilers
45251230 - Steam-generation plant construction work
44620000 - Central-heating radiators and boilers and parts
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
The subject is the construction, supply and commissioning of the K2 biomass boiler in the location of the Žďárské industrial zone, Kožichovice-Třebíč, in the premises of the KEC energy center in the area of the production plant. The subject is project design, delivery, production, assembly and commissioning of the new K2 boiler with a heat output of 2-2.4 MWt. It will also include a fuel tank, ash management, flue gas cleaning, connection to existing distribution systems and a control system, incl. construction parts of the cladding of the building of the new operation K2. In the design proposal, it is necessary consider connecting to the central heating system and coordinating the operation of the cogeneration center, biomass boiler K1 and heat pumps. The construction part will also include the Kolte K2 substation, which will be located outside the building but structurally separated from the operation area, the reason being protection against dust, temperatures and operational hygiene. The project entails the construction, supply, and commissioning of a biomass boiler (K2) at the Žďárský industrial zone in Kožichovice-Třebíč, within the KEC energy center complex. The scope of work covers the design, supply, manufacture, installation, and commissioning of a new K2 boiler with a thermal output of 2-2.4 MWt. Included are the fuel storage system, ash handling system, flue gas cleaning system, connections to existing distribution networks, and the control system, as well as the construction of the building enclosure for the new K2 unit. The design must account for connection to the district heating network and the coordinated operation of the cogeneration center, the K1 biomass boiler, and the heat pumps. The construction component also includes the K2 boiler substation; this will be located outside the main building but structurally separated from the operating area to ensure protection against dust and temperature fluctuations and to meet operational hygiene standa...