HIGHWAY COMPANY IN THE REPUBLIC OF SLOVENIA D.D. has floated a tender for Construction of the Connection of the Port of Koper to Ac Network - Srminska Vidnica. The project location is Slovenia and the tender is closing on 14 Mar 2024. The tender notice number is JN000577/2024-EUe16/01-P01, while the TOT Ref Number is 97848960. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Slovenia

Summary : Construction of the Connection of the Port of Koper to Ac Network - Srminska Vidnica

Deadline : 14 Mar 2024

Other Information

Notice Type : Tender

TOT Ref.No.: 97848960

Document Ref. No. : JN000577/2024-EUe16/01-P01

Competition : ICB

Financier : Self Financed

Purchaser Ownership : Public

Tender Value : Refer Document

Purchaser's Detail

Purchaser : HIGHWAY COMPANY IN THE REPUBLIC OF SLOVENIA D.D.
Street XIV. Division 4 City: Celje Postcode: 3000 Country: Slovenia Tel: +38612363796
Slovenia
Email :francim@projekt.si
URL :https://www.dars.si/

Tender Details

On the east side, the Srminska thief connects to the limb 3 of the Srmin splits, and on the west side the existing bridge across the Rizana River and the Rižana roundabout. The route along the entire length runs north of the extended freight railway station Koper, and in the north it borders first on agricultural land, and then to the facilities of Petrol, d.d. The construction of a two -lane with two lanes of 3.25 m wide and two edge belts of 0.25 m wide is planned. Bank widths along the lane are 1.50 m. The width of the pedestrian corridor is 1.50 m and the width of the banks by the pedestrian corridor is 0.50 m. Construction of the roadway comprises a new construction of the road from the intersection in the continuation of exit from the Krakow 3 of the Srmin junction towards Luka Koper to the existing Petrol parking lot, and from the existing parking lot, a reconstruction of the existing access road to the Petrol terminal is carried out. As part of the construction, the bridges are expanded at the entrance to the Petrol terminal and the bridge on the route of the Srmin lane, under which the products owned by Petrol are held. In accordance with Petrol Project Terms and Conditions, d.d. For the purpose of implementing the performance increase, the facilities are also being extended with the implementation of additional kineta, which in turn requires two ...

Documents

 Tender Notice