EUROPEAN UNION has floated a tender for Construction of Bsml Wastewater Treatment Plant and Wastewater Collection Project. The project location is Turkey and the tender is closing on 30 Apr 2019. The tender notice number is EuropeAid/140090/IH/WKS/TR, while the TOT Ref Number is 30234947. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Turkey

Summary : Construction of Bsml Wastewater Treatment Plant and Wastewater Collection Project

Deadline : 30 Apr 2019

Other Information

Notice Type : Tender

TOT Ref.No.: 30234947

Document Ref. No. : EuropeAid/140090/IH/WKS/TR

Competition : ICB

Financier : EuropeaAid

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : EUROPEAN UNION
Department of European Union and Foreign Relations, within Ministry of Environment and Urbanization, Çankaya /Ankara U?ur Mumcu Cad. No:88, Floor: 5, Gaziosmanpa?a 06680 Ankara Telephone: (+90) (312) 459 87 00 Fax: (+90) (312) 446 67 37
Turkey
Email :delegation-turkey@eeas.europa.eu

Tender Details

Prior Information Notice for CONSTRUCTION OF BSML WASTEWATER TREATMENT PLANT AND WASTEWATER COLLECTION PROJECT

Programme: PreAccession Countries / New Member States

Geographical Zone: Turkey

Type: Works

Status: Forecast

6. Description of the contract
The Works Contract shall consist of two Works Sections and as such they shall include the following:
Works Section 1: Construction of Bismil Wastewater Treatment Plant:
The main works to be carried out are as follows:
- Design and build of approximately 12, 500 m3/d average flow rate capacity wastewater treatment plant with activated sludge process for nitrogen and phosphorus removal. Sludge stabilization shall be accomplished within the activated sludge tanks.
- Demolishing of the existing treatment plant units
- Design and build of approximately 100 m, 1000 mm diameter reinforced concrete collector
- Testing and commissioning
- Training of the municipality staff on the operation of the WWTP
- 12 months supervision of operation after Taking Over (Defects Notification Period)
Works Section 2: Construction of Wastewater Collection:
The works contract mainly comprises such wastewater collection works under Works Section 2:
- Construction of approximately 25 km of wastewater collectors, approximately 500 manholes and 470 parcels manholes
- Testing and commissioning
- 12 months supervision of operation after Taking Over (Defects Notification Period)
Works Contract will be implemented under FIDIC Conditions of Contract for Plant and Design-Build (Yellow Book, 1999 edition).

Documents

 Tender Notice