Procurement Summary
Country: Poland
Summary: Construction of a Boiler Room at Primary School No. 3 in Biskupiec.
Deadline: 26 Mar 2026
Posting Date: 11 Mar 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 137553280
Document Ref. No.: 2026/BZP 00146896/01
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45331100 - Central-heating installation work
45112000 - Excavating and earthmoving work
45112700 - Landscaping work
45231000 - Construction work for pipelines, communication and power lines
45233253 - Surface work for footpaths
45310000 - Electrical installation work
45311100 - Electrical wiring work
45311200 - Electrical fitting work
45315000 - Electrical installation work of heating and other electrical building-equipment
45317300 - Electrical installation work of electrical distribution apparatus
45331110 - Boiler installation work
45332000 - Plumbing and drain-laying work
45332200 - Water plumbing work
45332300 - Drain-laying work
45333000 - Gas-fitting installation work
45400000 - Building completion work
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
The subject of the order is the implementation of an investment aimed at changing the heating method in the buildings of Primary School No. 3 in Biskupiec, consisting in the construction of an external natural gas installation, reconstruction of the external central heating installation from the complex external heating boiler to the existing central heating connection Primary School No. 3 at ul. Chrobrego 15 on plot no. 4-241/3 in the city of Biskupiec. Parameters: The subject of the investment is the reconstruction of the technological system of the exchanger together with the construction of a heat source in in the form of an external condensing gas boiler room with a closed combustion chamber with a total power of 200 kW with a heating medium parameter of 80/60C, in accordance with the technical specification for the execution and acceptance of works and the design documentation attached to the SWZ. includes all costs related to the implementation of the task, including surveying services along with the development of an as-built surveying report and the costs of the construction manager. The order is not divided into parts. The division into parts of the order would be for economic reasons, organizational, due to the principles of construction art, unjustified. Two or more contractors on the same construction site or in...
Documents
Tender Notice