Conlon Creek Culvert Removal Restoration, Goga Tender - 140555666

The INTERIOR, DEPARTMENT OF THE | NATIONAL PARK SERVICE has issued a Tender notice for the procurement of a Conlon Creek Culvert Removal Restoration, Goga in the USA. This Tender notice was published on 02 May 2026 and is scheduled to close on 15 May 2026, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 140555666, while the tender notice number is 140P8626R0003 and Registering on the platform.

Expired Tender

Procurement Summary

Country: USA

Summary: Conlon Creek Culvert Removal Restoration, Goga

Deadline: 15 May 2026

Posting Date: 02 May 2026

Other Information

Notice Type: Tender

TOT Ref.No.: 140555666

Document Ref. No.: 140P8626R0003

Competition: ICB

Financier: Self Financed

Purchaser Ownership: Public

Tender Value: Refer Document

Purchaser's Detail

Name: Login to see tender_details

Address: Login to see tender_details

Email: Login to see tender_detailsLogin to see details

Tender Details

Pre-Solicitation Announcement: Conlon Creek Culvert Removal & Restoration, GOGAThe Department of the Interior, National Park Service (NPS) at Golden Gate National Recreation Area (GOGA) has a requirement to implement a long-term channel stabilization project that would repair damage caused by a 2015 culvert blowout on a tributary to Redwood Creek. Emergency stabilization efforts occurred in 2016. The current channel stabilization design represents input from National Marine Fisheries Service, Regional Water Quality Control Board, as well as NPS technical staff (geomorphologist, aquatic ecologist) and engineering hydrologic consultants. The specifications and drawings call for stabilizing the footprint of the culvert failure and head cut with an engineered rock ramp, construction of three rock step pools to provide for some habitat for aquatic animals, and the removal of a buried and rusted corrugated metal culvert (80 ft). Work would occur along up to 250 ft of creek. In addition, an adjacent gully (75 ft) that is actively contributing sediments to downstream Redwood Creek would be stabilized and filled to reduce future contributions of fine sediments. Existing bank and bed materials would be re-used either in the channel or as fill for the adjacent gully. Rock slope protection would need to be purchased and transported to the site.The Contractor shall provide all supervision, labor, equipment, testing, and supplies necessary to complete the work as identified in the project specifications and associated documents provided as attachments to the solicitation. Contract work includes: 1. Mobilization and Demobilization2. Install, Operate, and Maintain Dewatering and Water Diversion Systems3. Selective Demolition4. Construction of Weirs, Ramp, and Apron5. Permanent Erosion Control Treatments and PlantingsOption Items1. Haul Excess Soils to Landfill2. Prepare As-Built Drawings3. Import Rock for Engineered Streambed MaterialIn channel work is restricted to between June 15...
Notice ID: 140p8626r0003

Department/Ind. Agency: interior, department of the

Original Set Aside: total small business set-aside (far 19.5)

Sub-tier: national park service

Office: pwr goga(86000)

Product Service Code: z2kb - repair or alteration of canals

NAICS Code: 237990 - Other Heavy and Civil Engineering Construction

Inactive Dates: may 30, 2026

Inactive Policy: 15 days after response date

Documents

 Tender Notice

Documents.zip


Request Demo
GiZ Tenders India

Procurement Documents for USA

Access a comprehensive library of standard procurement documents specific to USA. Here, you'll find all the essential forms, guidelines, and templates required for tender applications and submissions in USA

Explore Procurement Documents for USA


Want To Bid in This Tender?

Get Local Agent Support in USA and 60 More Countries.

View All The Services


View Tenders By


Publish Tenders


Have Any Dispute With The Purchaser?