Procurement Summary
Country: France
Summary: Competitive Dialogue Market for the Study, Manufacturing and Assembly of Two Variable Speed Turbine Pump Groups
Deadline: 06 Mar 2026
Posting Date: 10 Feb 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 135435558
Document Ref. No.: 94745-2026
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
As part of the relaunch of EDF Hydro's investments to contribute to the energy transition (flexibility, system service), the Montézic 2 project consists of building a new Power Pumping Energy Transfer Station (STEP). of approximately 500 MW (two groups 2 x 242 MW). The plant will be built in a new underground cavern while using the existing upstream and downstream reservoirs of the current 900 MW Montézic plant. Montézic is located in Occitanie in the department of Aveyron (12). The Groups market subject of the Competitive Dialogue is part of this overall project to build this new factory. The consultation will be carried out under the Competitive Dialogue procedure. This procedure allows you to interact with candidates pre-selected to co-construct or refine technical solutions aimed at a result. Its main interest is to deal with complex or innovative needs which cannot be defined beforehand, while respecting the principles of equality of processing, transparency and free access to the market. Competitive Dialogue Market for the study, manufacturing and assembly of two variable speed turbine pump groups As part of the relaunch of EDF Hydro investments to contribute to the energy transition (flexibility, system service), the Montézic 2 project consists of building a new Pumped Energy Transfer Station (STEP) with a power of approximately 500 MW (two groups 2 x 242 MW). The us...
Document Type: Contract Notice Contract Type: supplies Authority Type: pub-undert Doc Title: Competitive Dialogue Market for studies, manufacturing and assembly of two variable speed turbine pump groups Dispatch Date: 2026-02-06 Published Date: 2026-02-10 Submission Date: 2026-03-06
Documents
Tender Notice