Procurement Summary
Country: Poland
Summary: Carrying out Construction Works as Part of the Task Entitled "Works on Railway Line No. 143 on the Wrocław Psie Pole - Wrocław Sołtysowice Section"
Deadline: 29 Jun 2026
Posting Date: 18 Jun 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 143541243
Document Ref. No.: 419721-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45000000 - Construction work
45100000 - Site preparation work
45110000 - Building demolition and wrecking work and earthmoving work
45200000 - Works for complete or part construction and civil engineering work
45230000 - Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
45231400 - Construction work for electricity power lines
45234000 - Construction work for railways and cable transport systems
45300000 - Building installation work
71322000 - Engineering design services for the construction of civil engineering works
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Carrying out construction works as part of the task entitled "Works on railway line No. 143 on the Wrocław Psie Pole - Wrocław Sołtysowice section" The subject of the Order is the execution of the following elements: comprehensive modernization of the double-track electrified line railway no. 143 on the section from km 152.720 to km 155.974 in the scope of: 1) preparatory and accompanying works (including cutting down trees and bushes, surveying construction services, development of the area after the works, supplementary design works, certification, construction and maintenance of temporary roads and storage yards), 2) track system and track drainage, 3) engineering facilities, 4) road systems, 5) traveler service facilities, 6) cubature facilities, 7) overhead contact line, 8) railway traffic control, 9) telecommunications, 10) power industry, 11) external and internal sanitary installations, 12) environmental protection devices, 13) removing collisions with the designed infrastructure. Technical and operational parameters after modernization: • Maximum speed for passenger trains - 120 km/h, • Maximum speed for freight trains - 80 km/h, • Permissible axle load on tracks no. 1 and 2 - 221 kN, • Target traffic codes according to TSI (P4 for passenger traffic and F2 for freight traffic), • Maximum length trains: 630 m, • Building gauge: - GPL-1 for rebuilt facilities (GPL-2 for newly constructed facilities) in accordance with the design documentation, • Length of platforms - min. 150 m, • Height of platforms - 0.76 m (in...
Document Type: Contract Notice Reference Number: 9090/IREZA4/01910/02013/26/P Contract Type: works Authority Type: pub-undert Doc Title: Implementation of construction works under the task titled "Works on railway line No. 143 on the Wrocław Psie Pole - Wrocław section Sołtysowice” Dispatch Date: 2026-06-17 Publish Date: 2026-06-18 Submission Date: 2026-06-29
Documents
Tender Notice