Procurement Summary
Country: Australia
Summary: Byford Rail Extension - Stage 2
Deadline: 25 Nov 2025
Other Information
Notice Type: Tender
TOT Ref.No.: 127698331
Document Ref. No.: PTA250041
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
The Byford Rail Extension Stage 2 (Bre2) Project Is A Vital Element Of The Byford Rail Extension (Bre), Itself A Key Part Of The Broader Metronet Initiative. Bre Have Delivered New Signalling And Communications Infrastructure To Enable Urban, Electrified Rail Services To Operate To The New Byford Station.These Works Will Extends The Signalling And Communication Infrastructure Between Byford (Chainage 37.900Km) And Mundijong (Chainage 44.510Km), Enabling Regional Rail Services And The Removal Of Life Expired Signalling Equipment That Exists On This Section Of The Railway And Extend The Digital Radio Network To The Boundary Connection Between The Regional And Urban Rail Networks.. These Works Will Be Managed By The Pta Project Delivery (Ppd) And Extends Across Two Operational Jurisdictions:Pta Territory: Ch 37.897Km To Ch 42.100Kmarc Territory: Ch 42.100Km To Ch 44.510Km. This Project Is Time-Critical To Ensure That The Recommencement Of Regional Rail Services Is Not Delayed. The Outcomes And Requirements Are Clearly Articulated In These Request For Tender Documents, And A Briefing Will Be Held To Ensure That Respondents Understand The Public Transport Authority&Rsquo;S Requirements.The Contractor Shall Supply, Construct, Install, Test, Commission, And Hand Over (Including Entry Into Service And Final Asset Acceptance) All Required Works For The Main Cable Route (Mcr) From Byford Station To Mundijong Communications Equipment Room (Cer). The Works Are Structured Into Three Separable Portions. Separable Portions Are As Follows.I. Separable Portion 1: Works Up To Ch 42.200Kmsp1 Is The Installation Of The Mcr And All Associated Cabling Works Up To Chainage 42.200Km. It Includes All Required Interface Works With The Following Infrastructure Components:Byford Signalling Equipment Room (Ser)Byford Station Main Communication Room (Smcr)Track Side Equipment Room (Tser) A371acr397 (Mundijong North Radio Site)Ii. Separable Portion 2: Tser A416 Sp2 Is The Installation Of Tser A4...
Last date of submission : 25 Nov, 2025 11:00 AM
Documents
Tender Notice