Procurement Summary
Country : Switzerland
Summary : Building Master Work Truck -accessible Machine Path Chli Morgarten, Rothenthurm Annen Forst Engineering Office
Deadline : 04 Apr 2024
Other Information
Notice Type : Tender
TOT Ref.No.: 98123298
Document Ref. No. : 1401457
Competition : ICB
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Purchaser : OBERALLMINDKORPORATION SCHWYZ OAK
Contact Name: Oberallmeindkorporation Schwyz Oak procurement site/organizer: Annen Forst engineering office, to HDN. By André Annen, Sonnenbergrain 6, 6423 Seewen, Switzerland, phone: 041 810 29 70
Switzerland
Email :info@annenforst.ch
Tender Details
Construction of a machine path that can be accessed with trucks with a total length of 1, 620 m '. The new building includes many material shifts and transports within the construction site. There is a lot of pointing work to be expected in the local nail fluß rock. Suffer lines are installed on approx. 560 m '. The embankments are secured with blockstone walls at around 120 m '. The road is carried out with a gravel sand layer.
Demand/awarding authority: Oberallmindkorporation Schwyz Oak procurement site/organizer: Annen Forst engineering office, to HDN. by André Annen, Sonnenbergrain 6, 6423 Seewen, Switzerland, phone: 041 810 29 70, email: info@annenforst.ch
Publish Date: 04.03.2024
Procurement object
2.1 Type of the construction application: execution
2.2 Project title of procurement: Building worker work truck -accessible machine path Chli Morgarten, Rothenthurm
2.3 File number / project number: 2016_17
2.4 Division in lots?: No
2.5 Community vocabulary:
2.6 Subject and scope of the order: Construction of a machine route that can be accessed by truck with a total length of 1, 620 m '. The new building includes many material shifts and transports within the construction site. There is a lot of pointing work to be expected in the local nail fluß rock. Suffer lines are installed on approx. 560 m '. The embankments are secured with blockstone walls at around 120 m '. The road is carried out with a gravel sand layer.
2.7 Place of execution: Canton of Schwyz, Rothenthurm starting point: 2'692'727 / 1'218’337ENDPLING: 2'692'685 / 1'217’515
2.8 Duration of the contract, the framework agreement or the dynamic procurement system: 24 months after signing of the contract: This order can be extended: Yes: Description of the extensions: In the case of building delays due to unpredictable circumstances.
2.9 Options: No:
2.10 Surcharge criteria: Price G ...
Documents
Tender Notice