Procurement Summary
Country: Canada
Summary: Bronte Creek Slope Stability and Erosion Control at Mount Nemo Scout Camp - CH
Deadline: 25 May 2026
Posting Date: 28 Apr 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 140239157
Document Ref. No.: 270426
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
Description of WorksConservation Halton-s restoration program works to implement priority environmental restoration projects. The Nemo Camp slope stability and erosion control project is in partnership with Scouts Canada and prioritized as an overall benefit activity for Shinner shiner (Notropis photogenis) in Bronte Creek.
The project includes, but is not limited to, the rehabilitation of approximately 2160 m2 of eroded valley slope along a portion of Bronte Creek. The contractor is required to implement slope rehabilitation enhancements which include the following key features:1. Toe protection along the outside channel meander with a vegetated rock buttress2. Regrading of a point bar along the inside bank of the channel meander3. Surficial restoration of the eroded valley slope face with bioengineering
Show Categories : Utility, Supplies, Services, Construction, Infrastructure (Traffic Signalization), Affordable Housing, Parks, Trails & Landscape, Oil & Gas Pipe Construction, Roads, Bridge, Sidewalks, Drainage, Supplies (barricades, pylons, speed signs, etc.), Infrastructure, Building & Renovation, Municipal Drains, Power Lines, Infrastructure (Wastewater), Restoration Services, Remediation Services, Demolition, Heavy Duty Equipment
More Details
Bid Classification: Construction
Closing date05-25-2026
Documents
Tender Notice