Procurement Summary
Country: Canada
Summary: Boiler Replacement at Seneca Newnham Building D
Deadline: 09 Apr 2026
Posting Date: 21 Mar 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 138223918
Document Ref. No.: RFP No. 56-875-CTP
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Seneca-s Newnham Campus consists of multiple interconnected buildings. Hot water for buildings D and E is prepared by a central gas boiler plant located on Level 1 of Building D. Hot Water (HW) is used for heating and Domestic Hot Water (DHW) generation. The 5 gas fired boilers are housed in an enclosed boiler room which forms part of a larger mechanical room containing the campus- main chiller plant, heating and cooling pumps, and electrical equipment. The current gas fired boilers are estimated at 30 years old. Two of the boilers have undergone heat exchanger replacements at the start of 2026. As of now, 4 boilers are operational, with the fifth boiler being in decommissioned state, while remaining on site. The base scope includes the removal of 1 decommissioned gas fired boiler, while leaving the remaining 4 gas-fired boilers in operation. Supply and install a new electric boiler and connect to the existing heating system. Provide controls to operate the new electric boiler in sequence with existing equipment, while prioritizing the operation of the new electric boiler. Commission and provide start-up for new equipment.This MERX posting is for advertisement purposes only. Seneca Polytechnic uses a Euna Procurement portal for accepting and evaluating proposals digitally. Please contact Euna Procurement at [email protected] for technical questions related to your submission. You can also visit their help forum at https://customer.eunasolutions.com/public/s/kn...
Solicitation Type : RFP - Request for Proposal (Formal) Reference Number : 0000318118 Location : Canada, Ontario, Toronto Purchase Type : One Time Only- Delivery Date:2026/07/01 Description : Seneca’s Newnham Campus consists of multiple interconnected buildings. Hot water for buildings D and E is prepared by a central gas boiler plant located on Level 1 of Building D. Hot Water (HW) is used for heating and Domestic Hot Water (DHW) generation. The 5 gas fired boilers are housed in an enclosed boiler room which forms part of a larger mechanical room containing the campus’ main chiller plant, heating and cooling pumps, and electrical equipment. The current gas fired boilers are estimated at 30 years old. Two of the boilers have undergone heat exchanger replacements at the start of 2026. As of now, 4 boilers are operational, with the fifth boiler being in decommissioned state, while remaining on site. The base scope includes the removal of 1 decommissioned gas fired boiler, while leaving the remaining 4 gas-fired boilers in operation. Supply and install a new electric boiler and connect to the existing heating system. Provide controls to operate the new electric boiler in sequence with existing equipment, while prioritizing the operation of the new electric boiler. Commission and provide start-up for new equipment.This MERX posting is for advertisement purposes only. Seneca Polytechnic uses a Euna Procurement portal for accepting and evaluating proposals digital...
Documents
Tender Notice