Procurement Summary
Country : USA
Summary : Boggs L&D Fiber Reinforced Polymer (FRP) Floating Guide Wall
Deadline : 28 Apr 2025
Other Information
Notice Type : Tender
TOT Ref.No.: 117692122
Document Ref. No. : W912EE25S0005
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Description
W912EE - The USACE Vicksburg District is seeking qualified and capable contractors with the capability and capacity to perform the scope-of-work indicated.
The Corps of Engineers (COE), Vicksburg District does not intend to award a contract on the basis of responses received. This announcement is for information and planning purposes only and is not to be construed as a commitment by the Government, implied or otherwise, to issue a solicitation or make a contract award. No award will be made from this Sources Sought Notice, as this is NOT a request for proposal, quote, or invitation to bid.
PROJECT SPECIFIC DETAILS:
The U.S. Army Corps of Engineers, Vicksburg District requests letters of interest from qualified contractors capable of proving the products as specified for the following project:
Catahoula Parish, Louisiana, Red River, Lindy C. Boggs Lock and Dam (L&D No. 1), FRP Floating Guide Wall Project.
FRP Floating Guide Wall
The navigational lock at Lindy C. Boggs L&D utilizes three concrete floating guide wall pontoons at both upstream and downstream approaches. The concrete pontoon most downstream from the lock was damaged and pulled from service. This project serves to replace this damaged concrete guide wall pontoon with a modular FRP structure, via Supply Contract.
This project will require the design, proof of testing/concept, fabrication and delivery of new FRP pontoons. Some embedded steel to be used for connections to the existing guides in the concrete piers, and with a fender system to protect the structure from barge impacts. This new structure will be composed of modular sections, interlocked together to span the 226- gap between piers. The interlocking system should be easy to handle and assemble without heavy equipment. The new FRP pontoon will be similar geometry to the replaced concrete pontoon shown in Figures 2 and 3 below, and be dimensionally compliant with the existing piers, requiring no mod...
Active Contract Opportunity
Notice ID : W912EE25S0005
Related Notice
Department/Ind. Agency : DEPT OF DEFENSE
Sub-tier : DEPT OF THE ARMY
Major Command : US ARMY CORPS OF ENGINEERS
Sub Command : ENGINEER DIVISION MISSISSIPPI VALLEY
Office: W07V ENDIST VICKSBURG
General Information
Contract Opportunity Type: Sources Sought (Original)
Original Published Date: Apr 14, 2025 01:06 pm CDT
Original Response Date: Apr 28, 2025 12:00 pm CDT
Inactive Policy: 15 days after response date
Original Inactive Date: May 13, 2025
Initiative: None
Classification
Original Set Aside:
Product Service Code: 9330 - PLASTICS FABRICATED MATERIALS
NAICS Code: 326199 - All Other Plastics Product Manufacturing
Place of Performance: LA USA
Documents
Tender Notice
A08_PAN-DRAFT-Sources-Sought-FRP-Floating-Guide-Wa.docx