Procurement Summary
Country: Canada
Summary: Bcc07 Hvac Upgrades
Deadline: 10 Feb 2026
Posting Date: 20 Jan 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 133968413
Document Ref. No.: GOC6891518-CT
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
The project is to design an HVAC system using option 3 from the KC07 HVAC Re-commissioning StudyInvestigation and Report (GOC5012421) (see below):Lab 101, 102 and 104:- Train client regarding control and operation of existing HVAC system.- Set runtime ofthe fans based on client requirements, modify existing BAS as required and replace all fan switch labelingaccordingly.- Provide localized ventilation, including provision of a new exhaust fan, for Lab 104.Lab 105:- Demolish and cap existing ductwork serving Lab 107 and modify remaining ductwork to suit.-Provide new grille and ductwork, connected to existing exhaust serving adjacent washrooms.- Provide two (2)new standalone welding exhaust fans equipped with movable exhaust arms.- Train client regarding controland operation of existing HVAC system.Lab 107:- Demolish existing infrared heating located over mezzanine.- Demolish existing free cooling andpressurization unit.- Demolish/modify existing distribution ductwork and controls.- Provide new makeup airhandling unit equipped with cooling and heating.- Provide new exhaust fans to provide and maintain negativepressurization.- Provide new distribution ductwork and controls accordingly.- Train client regarding control andoperation of existing HVAC system.
Reference Number : 0000311057 Location : Canada, Ontario, ON - 11 - Ottawa Job Location 1 Haanel Drive Kanata, Ontario Canada K1A 1M1 Description : The project is to design an HVAC system using option 3 from the KC07 HVAC Re-commissioning StudyInvestigation and Report (GOC5012421) (see below):Lab 101, 102 and 104:- Train client regarding control and operation of existing HVAC system.- Set runtime ofthe fans based on client requirements, modify existing BAS as required and replace all fan switch labelingaccordingly.- Provide localized ventilation, including provision of a new exhaust fan, for Lab 104.Lab 105:- Demolish and cap existing ductwork serving Lab 107 and modify remaining ductwork to suit.-Provide new grille and ductwork, connected to existing exhaust serving adjacent washrooms.- Provide two (2)new standalone welding exhaust fans equipped with movable exhaust arms.- Train client regarding controland operation of existing HVAC system.Lab 107:- Demolish existing infrared heating located over mezzanine.- Demolish existing free cooling andpressurization unit.- Demolish/modify existing distribution ductwork and controls.- Provide new makeup airhandling unit equipped with cooling and heating.- Provide new exhaust fans to provide and maintain negativepressurization.- Provide new distribution ductwork and controls accordingly.- Train client regarding control andoperation of existing HVAC system.
Documents
Tender Notice