Procurement Summary
Country: USA
Summary: Base-Wide Fire Alarm System Upgrade, PEASE NH Air National Guard
Deadline: 04 Sep 2019
Posting Date: 31 Aug 2019
Other Information
Notice Type: Tender
TOT Ref.No.: 35926141
Document Ref. No.: W912WJ19X0036
Competition: ICB
Financier: Self Financed
Purchaser Ownership: -
Tender Value: Refer Document
CPV Classification
31625200 - Fire-alarm systems
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Base-Wide Fire Alarm System Upgrade, PEASE NH Air National Guard
Place of Performance .: PEASE NH Air National Guard BasePortsmouth, New Hampshire United States
Classification Code:Y -- Construction of structures and facilities
NAICS Code:238 -- Specialty Trade Contractors/238210 -- Electrical Contractors and Other Wiring Installation Contractors
Notice Type :Sources Sought
Response Date :Sep 04, 2019 11:59 pm Eastern
Archive Date :September 19, 2019
Synopsis: Sources Sought - W912WJ19X0036The U.S. Army Corps of Engineers, New England District is issuing a Sources Sought Announcement for a construction project to modernize the Base-wide Fire Alarm System at Pease Air National Guard Base, Newington, NH. This announcement is to determine the interest, availability and capability of 8(a), HUBZone, Service-Disabled Veteran-Owned, Women-Owned Small Business and Small Business concerns as described below. The NAICS code for this procurement is 238210. The project is planned to be issued on or about January 2020. The construction is expected to take approximately one year. The estimated construction cost is between $1, 000, 000.00 and $5, 000, 000.00.The project is an upgrade to the Base-wide Fire Alarm System. Currently the Base does not have a centralized base-wide fire alarm control system that meets UFC 3-600-01 standards. The fire alarm panels do not report via radio based transmission to a central system at the fire station. In addition, many older building fire alarms are not addressable and cannot integrate into an Emergency Mass Notification Warning System as required by the New Hampshire Air National GuardThe project includes replacing the fire alarm systems with primary receiving and dispatching systems with redundancy. It includes replacing non-compliant, non-addressable fire alarm control panels with addressable wireless control panels and transceivers with capability to report by radio transmission to a Monaco D-21 Central Receiving System. There are approximately 20 buildings slated for this upgrade. Under the authority of FAR 6.302-1, the U.S. Army Corps of Engineers intends to require, on a sole source basis, purchase and installation of certain Monaco Enterprises fire alarm system panels and transceivers for the project.The planned project work entails removal of existing wiring and panels, installation of new wiring and panels, installation of antennas, and testing of installed equipment. The project will require the participation of a Qualified Fire Protection Engineer (QFPE) for installation and testing of fire alarm panels in accordance with UFC 3-600-01. Per UFC 3-600-01, a QFPE is an individual who is a registered professional engineer who has passed the fire protection engineering written examination administered by the National Council of Examiners for Engin...
Documents
Tender Notice