Procurement Summary
Country: Poland
Summary: Adaptation of the School Premises for the Needs of the Kindergarten - Adapting the Staircase to Fire Protection Regulations, Installing a Smoke Exhaust System, Constructing a Vestibule, Installing (...)
Deadline: 06 Nov 2026
Posting Date: 23 Oct 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 151345910
Document Ref. No.: 2026/BZP 00500561/01
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
CPV Classification
45000000 - Construction work
45400000 - Building completion work
45410000 - Plastering work
45450000 - Other building completion work
45331100 - Central-heating installation work
45331210 - Ventilation installation work
45310000 - Electrical installation work
45421100 - Installation of doors and windows and related components
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_detailsLogin to see details
Tender Details
The scope of the order includes construction works taking into account current construction and sanitary standards, including: 1) construction industry - adaptation of rooms and staircase to fire protection regulations: a) separation of the staircase (partition walls in the REI 60 class, fire protection doors); b) division of corridors into I, 2nd and 3rd floors (partition walls in the REI 60 class, fire protection doors);c) installation of fire protection doors on the ground floor;d) replacement of windows with fire-resistant ones in the connector on the south side and on the ground floor near the staircases;e) replacement of entrance doors (2 pcs.) in the western facade with doors that meet evacuation requirements;f) replacement of windows in the lower part of the staircases on the western facade of the building, constituting an element of the staircase smoke removal system;g) painting works (staircase, partition walls, plasterboard construction, vestibule);h) addition of a vestibule with a connection on the south side.2) telecommunications industry - smoke removal from the staircase: a) installation of a linear temperature detector with wiring; b) installation of an addressable fire buffer power supply; c) installation of buttons (smoke exhaust, manual ventilation button, interrupt button and elements control and control...
Documents
Tender Notice