Procurement Summary
Country: France
Summary: 65 Fabian - Comprehensive Renovation of the General Electrical Installations (Ieg) and Control Command (Cc) of the Fabian Hydroelectric Plant (65).
Deadline: 06 Feb 2026
Posting Date: 06 Jan 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 133177279
Document Ref. No.: 3677-2026
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
The main purpose of this contract is the modernization of the control command of general services and groups, as well as the auxiliary alternating, continuous and corrugated TGBTs of the FABIAN factory. The objective of the operation is to replace frames opened by IEG-CC cabinets and electrical cables in compliance with the CCTG which is the main part of the general technical specifications applicable to the services of carrying out the electrical installations of the works hydroelectrics. 65 FABIAN - Comprehensive renovation of the General Electrical Installations (IEG) and Control Command (CC) of the Fabian hydroelectric plant (65). The main works, services and supplies provided for in this contract renovation are listed below: - General services control: replacement of general services control frames with new SG unit control cabinets, sectioning of factory control (transformer, VDT, etc.), replacement of the automaton with a SCHNEIDER M340 type model, reuse of certain equipment (e.g.: existing recorder), modification of the VDT interface box located at the factory; - Group command control: replacement of group control chassis using new group 1 unit and group 2 unit control cabinets, the reuse of certain equipment (e.g.: digital protection relays for existing type S groups, etc.)
Document Type: Contract Notice Reference Number: AVIS021044 Contract Type: services Authority Type: pub-undert Doc Title: 65 FABIAN - Overall renovation of the General Electrical Installations (IEG) and the Control Command (CC) of the hydroelectric plant of Fabian (65). Dispatch Date: 2026-01-05 Publish Date: 2026-01-06 Submission Date: 2026-02-06
Documents
Tender Notice