Procurement Summary
Country: Canada
Summary: 2Nd Floor Living Unit Washroom Upgrades - Construction Services
Deadline: 25 Aug 2026
Posting Date: 31 Jul 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 146284275
Document Ref. No.: GOC6445756-CT
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
The Work includes the investigation, repair, and restoration of the failed shower drainage system in the Alpha Unit washroom at the BC Immigration Holding Centre. The Contractor shall provide all Labour, materials, equipment, supervision, and services necessary to: Complete drainpipe scanning and verify existing conditions. Remove and replace failed drainage components, including associated plumbing as required. Remove and reinstate affected epoxy flooring and waterproofing systems. Replace existing motion-sensor lighting controls with wall-mounted switches. Provide temporary measures to maintain shower functionality and protect adjacent areas during construction. Test and commission all plumbing, waterproofing, and electrical work. Restore all disturbed areas and dispose of demolition materials. The facility will remain operational during construction. The Contractor shall coordinate all work with the Departmental Representative and minimize disruption to facility operations. Please refer to Attachment 3 - List of Specifications and Drawings for more detailed information.
Reference Number : 0000328742 Location : Canada, British Columbia, Vancouver, Coast & Mountains Job Location : B.C. Immigration Holding Centre 13130 76th Ave, Surrey V3W 2V6 Description : The Work includes the investigation, repair, and restoration of the failed shower drainage system in the Alpha Unit washroom at the BC Immigration Holding Centre. The Contractor shall provide all Labour, materials, equipment, supervision, and services necessary to: Complete drainpipe scanning and verify existing conditions. Remove and replace failed drainage components, including associated plumbing as required. Remove and reinstate affected epoxy flooring and waterproofing systems. Replace existing motion-sensor lighting controls with wall-mounted switches. Provide temporary measures to maintain shower functionality and protect adjacent areas during construction. Test and commission all plumbing, waterproofing, and electrical work. Restore all disturbed areas and dispose of demolition materials. The facility will remain operational during construction. The Contractor shall coordinate all work with the Departmental Representative and minimize disruption to facility operations. Please refer to Attachment 3 – List of Specifications and Drawings for more detailed information. :
Documents
Tender Notice