BACKGROUND The Port property at Pier 90 housed grain mill operations from 1923 until the early 1990-s. The site includes three sets of concrete-reinforced grain silos, grain elevators, steel ship loading towers, steel conveyor bridges connecting these structures, and ancillary buildings and structures, which include rail sheds, control buildings, a timber wharf, and five concrete pile-supported dolphin structures supporting the ship loading towers. Attachment 1 identifies the distinct components on the site. The grain silos have been vacant since 1992, and have attracted trespassers, resulting in vandalism and accumulated trash throughout the site. Security and maintenance of this property has been a net operating loss to the Port without any economic benefit to the community. The timber wharf adjacent to the silos has fallen into a state of disrepair. Piles and timber framing have deteriorated over time, and sections of wood deck and asphalt paving have fallen into Islais Creek. There are currently insufficient funds to demolish all vacant structures on the land side and waterside. To accomplish the greatest amount of work with the available funds, the project is separated into a base bid and bid alternates. Port staff and the consultant team determined that demolition of the nine ancillary buildings on site needs to be prioritized to significantly improve safety and security of the site, since these buildings are the main access points for trespassers. The silos will be more easily secured once the other connected buildings and entry points are demolished. The waterside demolition of the steel loading towers and timber wharf will be included as additive bid alternates to mitigate waterside access and hazards. The proposed scope will minimize the risk of trespassers entering the silos and endangering themselves or vandalizing the site. Phasing the demolition on site will allow the Port to move forward with the available funding and continue preparing th...
Start Date : 03/13/2025 10:00AM PDT
Due Date : 04/17/2025
Documents
Tender Notice