Procurement Summary
Country: USA
Summary: 26-02 Flooring Installation
Deadline: 11 May 2026
Posting Date: 14 Apr 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 139518482
Document Ref. No.: BD-24-1555-BS001-BS001-128046
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Bulletin Desc: Furnishing and Installing Flooring materials at the Following Schools Locke Middle School, Marshall Middle School Hajjar Elementary school and Dutile Elementary school. This work includes waste disposal, Flooring Prep, furnishing and installing of flooring materials described in the Scope of work Section in this bid. A mandatory Pre bid site visit is required in order to bid this project. That will take place on April 22nd at 9am. The contractor shall verify final field measurements.
Bid Number: BD-24-1555-BS001-BS001-128046
Bid Opening Date : 05/11/2026 11:00:00 AM
Location: BS001 - Billerica Public Schools Fiscal Year 24 Type Code NS Allow Electronic Quote No Alternate Id Required Date 04/14/2026 Available Date 04/14/2026 100000 AM Info Contact Bid Type OPEN Informal Bid Flag No Purchase Method Open Market Pre Bid Conference mandatory pre-bid meeting will take place on April 22, 2026 at 900 am, beginning at the Marshall Middle School, 15 Floyd Street, Billerica, MA. Bulletin Desc Furnishing and Installing Flooring materials at the Following Schools Locke Middle School, Marshall Middle School Hajjar Elementary school and Dutile Elementary school. This work includes waste disposal, Flooring Prep, furnishing and installing of flooring materials described in the Scope of work Section in this bid. A mandatory Pre bid site visit is required in order to bid this project. That will take place on April 22nd at 9am. The contractor shall verify final field measurements. Ship-to Address Holly Cunningham365 Boston RoadBillerica, MA 01821USEmail [email protected] (978) 528-7918FAX (978) 528-7909 Bill-to Address Holly Cunningham365 Boston RoadBillerica, MA 01821USEmail [email protected] (978) 528-7918FAX (978) 528-7909 Print Format Bid Print Required Quote Attachments Item Information Item # 1 ( 72-13 - 00 ) Furnishing and Installing Flooring materials at the Following Schools Locke Middle School, Marshall Middle School Hajjar Elementary school and Dutile Elementary school. This work includes waste disposal, Flooring Prep, furnishing and installing of flooring materials described in the Scope of work Section in this bid. A mandatory Pre bid site visit is required in order to bid this project. That will take place on April 22nd at 9am. The contractor shall verify final field measurements. U N S P S C Code 72-13-00 General building construction Qty Unit Cost UOM Total Discount Amt. Total Cost 1.0 EA - Each Manufacturer B...
Documents
Tender Notice