Procurement Summary
Country: USA
Summary: 2026 Test Well 25 Construction
Deadline: 16 Jun 2026
Posting Date: 27 May 2026
Other Information
Notice Type: Tender
TOT Ref.No.: 142100422
Document Ref. No.: Water-Test Well 25-2026
Competition: ICB
Financier: Self Financed
Purchaser Ownership: Public
Tender Value: Refer Document
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
The City of Caldwell, Idaho will receive bids for Project Title.Bids are currently due on or before Proposal Submission Time, on Proposal Submission Date.The City of Caldwell is requesting bids for construction of a test well at the Caldwell Housing Authority property, located at the southeast corner of State Highway 44 and Farmway/Kent Ranch Road in Caldwell, Idaho (NWNW Section 9, T4N, R3W). The project site is located on approximately 0.59 acres of Caldwell Housing Authority property and includes sufficient access and working space for drilling operations and associated equipment. The proposed test well location meets applicable Idaho Department of Water Resources (IDWR) Well Construction Standards and has been selected to allow future correlation of test well results with the planned municipal supply well. The test well location will be surveyed and staked prior to construction.The project consists of drilling and construction of a multi-level monitoring test well to an anticipated maximum depth of approximately 600 feet. The test well is planned to include up to seven (7) individual monitoring wells within a single minimum 19-inch diameter borehole with 20-inch diameter steel surface casing, with the potential for an additional shallow monitoring well if needed. Monitoring wells are anticipated to consist of 4-inch diameter Schedule 80 PVC casing and slotted PVC screen, designed to accommodate low-capacity test pumping for groundwater quality evaluation. Final screen intervals and well configurations will be determined based on subsurface conditions encountered during drilling, including review of drill cuttings and geophysical logs.Work includes installation of surface casing and annular seals in accordance with IDWR standards, drilling of a pilot borehole, collection of lithologic samples, and completion of geophysical logging including normal resistivity, single-point resistance, and gamma logs. Graded sand filter packs and cement-bentonite annular seals ...
Documents
Tender Notice