Procurement Summary
                          Country:  Australia
                          Summary: 2024Q052c Chlorine Gas Servicing
                          Deadline: 04 Oct 2024
                          Other Information
                          Notice Type: Tender
                          TOT Ref.No.: 107626556
                          Document Ref. No.: VP430369
                          
                          Financier: Self Financed
                          Purchaser Ownership: Public
                          Tender Value: Refer Document
                          Purchaser's Detail
                                Name: Login to see tender_details
                                Address: Login to see tender_details
                                Email: Login to see tender_details
Login to see detailsTender Details
                                The below scope and equipment list is for the 12 monthly Planned Maintenance of all existing Chlorine gas dosing units across CHRC and the servicing of an UV unit at Sapphire WTP as a separable portion. A service report is to be provided for each site outlining works completed and any potential defects observed. Central Highland Regional Council is seeking a suitably qualified contractor to enter a service agreement to annually service Chlorine Gas dosing systems at East Nogoa WTP, Black Gully WWTP, Opal St WTP, Park Avenue WWTP, Springsure Two Tanks Road, Springsure Dam St, Tieri WTP, Tieri WWTP, Capella WTP and Sapphire WTP. Service report to be delivered within two weeks of completion of servicing detailing asset condition along with defects/potential defects.Chlorine Gas Maintenance ScopeVacuum Regulators• Purge system of gas• Remove in service regulators• Strip and inspect cartridge nipple and heater filter blocks (note defects)• Clean & inspect cylinder valves (note any defects)• Install genuine manufacturers Planned Maintenance kit• Test for air/gas leaks & test change over operation.Chlorinator/Rate Meters• Record rotameters Size & Part number.• Remove & clean rotameter tubes.• Strip, clean & inspect V10K internals (note any defects) • Overhaul with manufacturer-s PM kits. • Reassemble & install back into service. • Vacuum & operation test. • Test vacuum switches - confirm Hi and Lo vacuum alarms.Controllers• Record Model/ Serial Number.• Check operational alarms & fu...
                          Documents
                
                           Tender Notice