Procurement Summary
Country : Canada
Summary : 2024015 Cell 9 Construction
Deadline : 19 Mar 2025
Other Information
Notice Type : Tender
TOT Ref.No.: 115570849
Document Ref. No. : AB-2025-01673
Financier : Self Financed
Purchaser Ownership : Public
Tender Value : Refer Document
Purchaser's Detail
Name :Login to see tender_details
Address : Login to see tender_details
Email : Login to see tender_details
Login to see detailsTender Details
Work includes: .1 Mobilization and demobilization of equipment to site, including construction of haul roads from the Cell 9 area to the stockpile areas, and any other haul roads required during construction, prime contractor duties, site safety, all temporary works and facilities necessary to complete the project, and demobilization including all restoration of temporary facilities and disturbed areas. .2 Stripping topsoil, subsoil, and unsuitable surface material from within the Cell 9 footprint, interior access road, surface water ditches, stockpile area (if required), and any other area to be disturbed during construction, and hauling of material to the appropriate stockpile area as shown on the drawings or directed by the Engineer. .3 Excavation of Cell 9, including the construction of Cell 9 interior access road, Cell 9 embankments, berms, and stockpiling of excess material. .4 Preparation of the subgrade layer in preparation of placement of the liner system (including slopes). .5 Excavation and backfill of the geosynthetics anchor trench as shown on the construction drawings. .6 Supply and Installation of the GCL. .7 Supply and Installation of the geomembrane liner. .8 Supply and installation of the drainage layer. .9 Supply and Installation of the Cell 9 leachate collection system (including, but not limited to, excavation of the trench and sump, supply and install of drainage aggregate, geotextile, and piping infrastructure/accessories). .10 Construction of the inter...
Solicitation Type : RFP - Request for Proposal (Formal)
Reference Number : 00004435874
Location : Alberta
Purchase Type : Not Stated
Dates Publication : 2025/02/28 09:48:00 AM EST
Closing Date : 2025/03/19 04:00:00 PM EDT
Contact Information : Kiran Bhangu
: engineering@claystonewaste.com
:
Description : Work includes: .1 Mobilization and demobilization of equipment to site, including construction of haul roads from the Cell 9 area to the stockpile areas, and any other haul roads required during construction, prime contractor duties, site safety, all temporary works and facilities necessary to complete the project, and demobilization including all restoration of temporary facilities and disturbed areas. .2 Stripping topsoil, subsoil, and unsuitable surface material from within the Cell 9 footprint, interior access road, surface water ditches, stockpile area (if required), and any other area to be disturbed during construction, and hauling of material to the appropriate stockpile area as shown on the drawings or directed by the Engineer. .3 Excavation of Cell 9, including the construction of Cell 9 interior access road, Cell 9 embankments, berms, and stockpiling of excess material. .4 Preparation of the subgrade layer in preparation of placement of the liner system (including slopes). .5 Excavation and backfill of the geosynthetics anchor trench as shown on the construction drawings. .6 Supply and Installation of the GCL. .7 Supply a...